BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ESWP - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://eswp.com
X-WR-CALDESC:Events for ESWP
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20190310T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20191103T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20200308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20201101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20201001T120000
DTEND;TZID=America/New_York:20201001T130000
DTSTAMP:20260409T050441
CREATED:20200903T123942Z
LAST-MODIFIED:20201001T153909Z
UID:10000234-1601553600-1601557200@eswp.com
SUMMARY:An ESWP Program Committee Webinar - Bonner Bridge Replacement
DESCRIPTION:A New Bridge over the Oregon Inlet\, Outer Banks\nPDH REQUEST FORM\nPresented by Nick Burdette\, HDR\, Pittsburgh\, PA\nTraveling the scenic North Carolina Outer Banks on NC Highway 12 requires crossing Oregon Inlet\, one of the most dangerous inlets on the Atlantic coast\, where treacherous currents\, constantly shifting bathymetry\, and violent storms are normal occurrences. Since its completion in 1962\, the Herbert C. Bonner Bridge served as that critical link between Hatteras and Bodie Islands. Unfortunately\, the Bonner Bridge has suffered from severe scour and deterioration in the harsh marine environment\, and has required nearly continual maintenance\, repair\, and retrofit. In 2011\, NCDOT awarded a design-build contract to replace the bridge\, requiring a 100-year service life\, design for up to 84’ of scour\, and minimal environmental impacts. The associated design and construction challenges created opportunities for innovation and creativity. The resulting 2.8 mile long bridge features extensive use of precast concrete construction for quality\, durability\, economy\, and constructability\, a first-of-its-kind driven pile foundation verification method\, and innovative\, environmentally-sensitive construction approaches. \n  \nFree to attend\, earn 1 PDH Credit\, from the comfort of your computer  \n  \n \n  \n← Click the computer to register (then use Register link on the left)
URL:https://eswp.com/event/webinar-october-1/
LOCATION:ESWP Webinar
ORGANIZER;CN="ESWP":MAILTO:eswp@eswp.com
END:VEVENT
END:VCALENDAR