BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ESWP - ECPv6.15.16//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-ORIGINAL-URL:https://eswp.com
X-WR-CALDESC:Events for ESWP
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20200308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20201101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20210325T120000
DTEND;TZID=America/New_York:20210325T130000
DTSTAMP:20260403T230029
CREATED:20210308T154042Z
LAST-MODIFIED:20210308T154831Z
UID:10000109-1616673600-1616677200@eswp.com
SUMMARY:IBC Webinar
DESCRIPTION:“Best of IBC” Webinar Series\nThe Best of IBC Webinar Series is a great way to preview the high quality technical content presented at the International Bridge Conference®.\n \n  \nAttendees can earn 1 pdh credit! \nVirtual webinars are FREE to attend\, but registration is required for pdh certification. \n  \n\n  \nTopic: Accelerated Bridge Construction  —  Scroll Down to Register\nIBC 20-08: EB Wilson Boulevard Bridge over Route 50: ABC Weekend Superstructure Replacement\nKelly Guild\, P.E.\, WSP USA\, Herndon\, VA; John Michels\, WSP USA\, Herndon\, VA; Alireza Hedayati\, WSP USA\, Herndon\, VA; Vincente Valeza\, Virginia DOT\, Northern Virginia District\, Fairfax\, VA; Pooya Azar\, Martins Construction Corporation\, Falls Church\, VA \nIn one of Northern Virginia’s busiest\, most complicated and high traffic volume intersections\, the superstructure of the EB Wilson Boulevard Bridge over Route 50 was demolished\, removed\, and replaced in a single weekend to minimize impact to the traveling public and local business community. The design utilized ABC methodology including three preconstructed composite units erected at the site using very early strength latex concrete deck closure pours providing the required cure time\, strength and durability. \nIBC 20-09: Wellsburg Bridge – Construction Methods and Float In\nCharbel Raad\, McNary Bergeron & Associates\, Tampa\, FL; Tim Davis\, McNary Bergeron & Associates\, Tampa\, FL; Rob Brunner\, Flatiron Construction\, Wellsburg\, WV \nThe Wellsburg Bridge is an 830-foot span basket-handle network tied arch connecting Wellsburg\, WV and Brilliant\, OH across the Ohio River. This arch span is being constructed using an Accelerated Bridge Construction method where the main span is built at a site roughly 1 mile upstream along the Ohio River and will be floated into its permanent position using a system of self-jacking falsework towers and barges.
URL:https://eswp.com/event/31653/
LOCATION:Virtual Event
END:VEVENT
END:VCALENDAR