BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ESWP - ECPv6.15.20//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ESWP
X-ORIGINAL-URL:https://eswp.com
X-WR-CALDESC:Events for ESWP
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20230312T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20231105T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20221004T080000
DTEND;TZID=America/New_York:20221004T100000
DTSTAMP:20260409T004336
CREATED:20220902T153040Z
LAST-MODIFIED:20221004T133106Z
UID:10000326-1664870400-1664877600@eswp.com
SUMMARY:ESWP / PSPE Program with ALCOSAN
DESCRIPTION:SAVE THE DATE!\nRegistration & Breakfast Buffet – 8am \nProgram – 8:30am \nThe ALCOSAN Wastewater Treatment Expansion and the Ohio River Tunnel (ORT) Project are part of The Clean Water Plan (CWP)\, a $2 billion\, long-term plan ALCOSAN submitted as a solution to eliminate approximately 7 billion gallons of combined sewer overflows (CSOs) annually into the Ohio\, Allegheny\, and Monongahela Rivers by 2036.  As required by a Consent Decree signed by the U.S. Department of Justice\, U.S. Environmental Protection Agency\, and the PA Department of Environmental Protection\, ALCOSAN is required to implement the CWP with an aggressive schedule. \nThe CWP includes the proposed expansion at the Woods Run WWTP.  The proposed upgrades will expand the WWTP wet weather primary treatment capacity to 600 mgd. The secondary capacity of the WWTP will be increased to 295 mgd\, from its currently permitted full treatment capacity of 250 mgd. The major projects associated with the expansion include a wet weather pump station\, a 360 mgd east headworks facility\, additional primary sedimentation and final secondary settling tanks\, solids thickening and dewatering improvements\, and construction of a second chlorine contact tank with a dry weather discharge outfall. \nThe Ohio River Tunnel (ORT) is the first of three new\, large diameter deep tunnel projects that ALCOSAN will use toward the CWP’s overall goal to significantly reduce CSOs released into the region’s three rivers.   The ORT Project includes one main rock tunnel (approximately 150 feet below ground) generally running parallel to the Ohio and Allegheny Rivers and two branch tunnels crossing beneath the Ohio River.   The primary components of the ORT project include the main rock tunnel\, ten shafts\, two branch tunnels (Chartiers Creek and Saw Mill Run) and several near surface facilities. \n  \nSpeakers: Mike Lichte and Kim Kennedy \n  \n  \n 
URL:https://eswp.com/event/eswp-pspe-breakfast-program/
LOCATION:ESWP\, 337 Fourth Avenue\, Pittsburgh\, PA\, United States
ORGANIZER;CN="ESWP":MAILTO:eswp@eswp.com
GEO:40.4391475;-79.9999069
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=ESWP 337 Fourth Avenue Pittsburgh PA United States;X-APPLE-RADIUS=500;X-TITLE=337 Fourth Avenue:geo:-79.9999069,40.4391475
END:VEVENT
END:VCALENDAR