BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ESWP - ECPv6.17.0//NONSGML v1.0//EN
CALSCALE:GREGORIAN
METHOD:PUBLISH
X-WR-CALNAME:ESWP
X-ORIGINAL-URL:https://eswp.com
X-WR-CALDESC:Events for ESWP
REFRESH-INTERVAL;VALUE=DURATION:PT1H
X-Robots-Tag:noindex
X-PUBLISHED-TTL:PT1H
BEGIN:VTIMEZONE
TZID:America/New_York
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20200308T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20201101T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20210314T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20211107T060000
END:STANDARD
BEGIN:DAYLIGHT
TZOFFSETFROM:-0500
TZOFFSETTO:-0400
TZNAME:EDT
DTSTART:20220313T070000
END:DAYLIGHT
BEGIN:STANDARD
TZOFFSETFROM:-0400
TZOFFSETTO:-0500
TZNAME:EST
DTSTART:20221106T060000
END:STANDARD
END:VTIMEZONE
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20211115T113000
DTEND;TZID=America/New_York:20211115T160000
DTSTAMP:20210908T152731Z
CREATED:20210908T152731Z
LAST-MODIFIED:20210908T152731Z
UID:10000281-1636975800-1636992000@eswp.com
SUMMARY:IBC Technical Program Committee
DESCRIPTION:IBC Technical Program Committee Meeting
URL:https://eswp.com/event/ibc-technical-program-committee/
LOCATION:ESWP\, 337 Fourth Avenue\, Pittsburgh\, PA\, United States
CATEGORIES:ESWP Conference
GEO:40.4391475;-79.9999069
X-APPLE-STRUCTURED-LOCATION;VALUE=URI;X-ADDRESS=ESWP 337 Fourth Avenue Pittsburgh PA United States;X-APPLE-RADIUS=500;X-TITLE=337 Fourth Avenue:geo:-79.9999069,40.4391475
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20210823T163000
DTEND;TZID=America/New_York:20210823T180000
DTSTAMP:20210728T113019Z
CREATED:20210728T113019Z
LAST-MODIFIED:20210728T113019Z
UID:10000276-1629736200-1629741600@eswp.com
SUMMARY:IBC Executive Committee Meeting
DESCRIPTION:IBC Executive Committee Meeting
URL:https://eswp.com/event/ibc-executive-committee-meeting-4/
LOCATION:Virtual Event
CATEGORIES:ESWP Meeting
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20210520T120000
DTEND;TZID=America/New_York:20210520T130000
DTSTAMP:20210520T204605Z
CREATED:20210326T143132Z
LAST-MODIFIED:20210520T204605Z
UID:10000116-1621512000-1621515600@eswp.com
SUMMARY:IBC Webinar - Design
DESCRIPTION:“Best of IBC” Webinar Series\nThe Best of IBC Webinar Series is a great way to preview the high quality technical content presented at the International Bridge Conference®.\n \n  \nAttendees can earn 1 pdh credit! \nVirtual webinars are FREE to attend\, but registration is required for pdh certification. \n  \n\n  \nTopic: Design\nWhen: Thursday\, May 20\, 2021\nTime: 12:00 Noon – 1:00 PM\nIBC 20-17: Emergency Response and Repair of State Route 6 Bridge over French Creek following Over-Height Vehicle Strike\nFrank Artmont\, Ph.D.\, P.E.\, Modjeski and Masters\, Mechanicsburg\, PA; Andrew Adams P.E.\, Modjeski and Masters\, Mechanicsburg\, PA; Hadi Kenarangi\, Ph.D.\, Modjeski and Masters\, Mechanicsburg\, PA; Christopher Smith\, P.E.\, Modjeski and Masters\, Mechanicsburg\, PA; Mark Bredl\, P.E.\, Pennsylvania DOT\, Oil City\, PA \nIn January 2019\, an over-height vehicle struck a through-truss bridge carrying State Route 6 over French Creek in northwestern Pennsylvania\, which caused severe damage to the truss verticals and necessitated the structure’s closure. This presentation will highlight the design stage work on the project\, including the initial response\, finite element analysis\, and development of the repair schemes\, which enabled the structure to be successfully repaired and reopened in under three months from the accident. \nIBC 20-18: Rehabilitation and Widening of the Historic I-78 Mainline Spandrel Arch Bridge\nCarol Choi\, T.Y. Lin International\, San Francisco\, CA; Siew Chee\, T.Y. Lin International\, San Francisco\, CA; Crystal Lui\, T.Y. Lin International\, San Francisco\, CA; Sajid Abbas\, T.Y. Lin International\, San Francisco\, CA \nAs one of the largest bridge projects in Pennsylvania\, the I-78/ SR 61 Interchange Improvement is a multi-phased project currently under design and construction. Rehabilitation and widening of the historic I-78 multiple-span arch bridge over the Schuylkill River is a part of this larger scope. Built in 1955\, the existing bridge includes an eight-span\, concrete spandrel arch bridge with typical spans of 157.5 ft with an overall length of 1742 ft. The widened spandrel arch bridge will add one lane on each of the existing westbound and eastbound roadways\, to a total of six traffic lanes with shoulders. \n 
URL:https://eswp.com/event/ibc-webinar-design/
LOCATION:Virtual Event
END:VEVENT
BEGIN:VEVENT
DTSTART;TZID=America/New_York:20210325T120000
DTEND;TZID=America/New_York:20210325T130000
DTSTAMP:20210308T154831Z
CREATED:20210308T154042Z
LAST-MODIFIED:20210308T154831Z
UID:10000109-1616673600-1616677200@eswp.com
SUMMARY:IBC Webinar
DESCRIPTION:“Best of IBC” Webinar Series\nThe Best of IBC Webinar Series is a great way to preview the high quality technical content presented at the International Bridge Conference®.\n \n  \nAttendees can earn 1 pdh credit! \nVirtual webinars are FREE to attend\, but registration is required for pdh certification. \n  \n\n  \nTopic: Accelerated Bridge Construction  —  Scroll Down to Register\nIBC 20-08: EB Wilson Boulevard Bridge over Route 50: ABC Weekend Superstructure Replacement\nKelly Guild\, P.E.\, WSP USA\, Herndon\, VA; John Michels\, WSP USA\, Herndon\, VA; Alireza Hedayati\, WSP USA\, Herndon\, VA; Vincente Valeza\, Virginia DOT\, Northern Virginia District\, Fairfax\, VA; Pooya Azar\, Martins Construction Corporation\, Falls Church\, VA \nIn one of Northern Virginia’s busiest\, most complicated and high traffic volume intersections\, the superstructure of the EB Wilson Boulevard Bridge over Route 50 was demolished\, removed\, and replaced in a single weekend to minimize impact to the traveling public and local business community. The design utilized ABC methodology including three preconstructed composite units erected at the site using very early strength latex concrete deck closure pours providing the required cure time\, strength and durability. \nIBC 20-09: Wellsburg Bridge – Construction Methods and Float In\nCharbel Raad\, McNary Bergeron & Associates\, Tampa\, FL; Tim Davis\, McNary Bergeron & Associates\, Tampa\, FL; Rob Brunner\, Flatiron Construction\, Wellsburg\, WV \nThe Wellsburg Bridge is an 830-foot span basket-handle network tied arch connecting Wellsburg\, WV and Brilliant\, OH across the Ohio River. This arch span is being constructed using an Accelerated Bridge Construction method where the main span is built at a site roughly 1 mile upstream along the Ohio River and will be floated into its permanent position using a system of self-jacking falsework towers and barges.
URL:https://eswp.com/event/31653/
LOCATION:Virtual Event
END:VEVENT
END:VCALENDAR