IBC 19-20, 21, 22, 23, 24, 25, 26

$25.00

IBC 19-20: Iowa City Gateway: Park Road Bridge
Natalie McCombs, P.E., S.E., and Sarah Larson, P.E., HNTB, Kansas City, MO

IBC 19-21: Evaluation of Fabrication Effects for a Lift Bridge Steel Orthotropic Deck (Unpublished)
Sougata Roy, Ph.D., Rutgers, The State University of New Jersey, Piscataway, PA; Soham Mukherjee, AECOM, Mechanicsburg, PA; Ronald Medlock, P.E., High Steel Structures, LLC, Lancaster, PA

IBC 19-22: Centennial Bridge – A New Connection to the Historic Cabrillo Bridge in Balboa Park
Anthony Sanchez, PhD, P.E., Patrick Chang, and Jason Hong, Moffatt & Nichol, San Diego, CA

IBC 19-23: Steel Bridge Member Resistance – AASHTO Compared to Other International Codes
Terry Cakebread, BSc, Ceng., MICE, LS, New York, NY; Steve Rhodes, Beng., MSc., Ceng., MICE, LS, Kingston-Upon-Thames, Surrey United Kingdom

IBC 19-24: NJDOT Sign Structure LRFD Design Standard Upgrades
George Zimmer, Rama Krishnagiri, P.E., and Steve Esposito, P.E., WSP USA, Lawrenceville, NJ; Eddy Germain, P.E., and Xiaohua “Hannah” Cheng, P.E. and Kimberly Sharp, New Jersey DOT, Ewing Township, NJ

IBC 19-25: Effects of Stiffness, Creep, and Shrinkage on RC Arch Bridges
Leon Lung-Yang Lai, Ph.D., P.E., S.E., Specialty Engineering, Inc., Bristol, PA; Kamlesh Ashar, Pennsylvania Department of Transportation, Allentown, PA

IBC 19-26: Measurement and Use of Pile Set-Up in Design and Construction of the I-480 Valley View Bridge
Randy Thomas and Charles Winter, P.E., D.GE., Jacobs, Milwaukee, WI; William Banik, Walsh Construction, Crown Point, IN

Reviews

There are no reviews yet.

Be the first to review “IBC 19-20, 21, 22, 23, 24, 25, 26”

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.