IBC 19-27, 28, 29, 30, 31, 32, 33

$25.00

IBC 19-27: Contractor Manager/General Contractor (CMGC) Delivery of a Tied Steel Arch Bridge Re-Decking (Unpublished)
Jonathan Eberle, P.E., AECOM, Mechanicsburg, PA; John Milius, AECOM, Philadelphia, PA; Paul Kettleson, Minnesota DOT, Oakdale, MN; Steve Kaldenbach, Kraemer North America, Burnsville, MN

IBC 19-28: NEXT beam bridges for 100 plus year service life
Jianwei Huang Ph.D., P.E., Southern Illinois University Edwardsville, Edwardsville, IL

IBC 19-29: Curtis Creek Bridge Rehabilitation CMAR
Donald Marinelli, P.E., Hardesty & Hanover, Annapolis, MD; William Pines, P.E., Maryland Transportation Authority, Baltimore, MD

IBC 19-31: A Beacon of Coastal Beauty – Inspired by Community Vision
William Johnson, IV, P.E., S.E., Figg Bridge Engineers, Inc., Exton, PA

IBC 19-32: Design & Construction of the Shimla Cable Stayed Bridge
Lucas Wise, CPEng. And Mithun Mohan, Systra – International Bridge Technologies, Jumeirah Lakes Towers, Dubai United Arab Emirates

IBC 19-33: Suspender Cable Inspection Using Advanced Robotic Technology at Arrigoni Bridge
Muhammad Asif Iqbal, P.E., LEED Green Associate and Aslam Siddiqui, P.E., AI Engineers, Inc., Middletown, CT; Doug Thaler, P.E., Infrastructure Preservation Corporation, Washington, DC; Gregory Funk, P.E., Connecticut DOT, Newington, CT

Reviews

There are no reviews yet.

Be the first to review “IBC 19-27, 28, 29, 30, 31, 32, 33”

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.