IBC 19-34, 35, 36, 37, 38, 39, 40

$25.00

IBC 19-34: Rehabilitation of an Historic Phoenix Column Truss Bridge Due to Vehicular Collision
John Baumgardner, P.E., HDR, Inc., Plymouth Meeting, PA; Monica Harrower, Henry Berman, P.E. and Din Abazi, P.E., Pennsylvania DOT, King of Prussia, PA

IBC 19-35: Lightweight Superstructure Replacement of the Bridge Carrying Baltimore Harbor Tunnel Thruway Over Patapsco River Flats
Shilpa Kodkani, P.E., Christine Szympruch, P.E. and Robert Healy, P.E., Rummel Klepper and Kahl, Baltimore, MD; William Pines, P.E., Maryland Transportation Authority, Nottingham, MD; Joseph Hoffmann, P.E., McLean Contracting Company, Glen Burnie, MD

IBC 19-36: Adams Avenue Historic Arch Structure Rehabilitation
Christopher Bentz, P.E. and Ronald Krolick, P.E., Alfred Benesch and Company, Pottsville, PA; Monica Harrower, Din Abazi, P.E. and Henry Berman, Pennsylvania DOT, King of Prussia, PA

IBC 19-37: Design and Construction of Blenheim Covered Bridge
Sean James, P.E. and Josif Bicja, P.E., Hoyle, Tanner & Associates, Inc., Manchester, NH

IBC 19-38: Retrofitting the Burlington-Bristol Bridge
Danielle Schroeder, EIT, Jesse Gormley, P.E., ENV SP and John Prader, Ph.D., P.E., Pennoni, Philadelphia, PA

IBC 19-39: Jacques Cartier Bridge – Challenges in Wind Rehabilitation Work of an Old Steel Truss Bridge
Stoyan Stoyanoff, Ph.D., P.Eng., ing., RWDI, Bromont, Quebec Canada; Sylvie Boulanger, ing., P.Eng. Ph.D., JCCBI, Longueuil, Quebec Canada; Steve Zhu, COWI North America, North Vancouver, BC Canada

IBC 19-40: Multiaxial Fatigue Life Assessment of a Vertical-Lift Bridge Connection using Strain Rosette Data
Sofia Puerto Tchemodanova and Masoud Sanayei, Tufts University, Medford, MA; Erin Santini Bell, University of New Hampshire, Durham, NH

Reviews

There are no reviews yet.

Be the first to review “IBC 19-34, 35, 36, 37, 38, 39, 40”

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.