IBC 19-48, 49, 50, 51, 52, 53, 54

$25.00

IBC 19-48: Owner Objectives and Delivery Method for the New Samuel De Champlain Bridge Corridor Project
Guy Mailhot, P.Eng., M.Eng., Infrastructure Canada, Montreal, QC, Canada

IBC 19-49: The New Samuel De Champlain Bridge – Performance and Design Criteria
Marwan Nader, Ph.D., P.E., T.Y. Lin International, San Francisco, CA

IBC 19-50: Design of the Cable-Stayed Bridge Signature Span of the New Samuel De Champlain Bridge
Marwan Nader, Ph.D., P.E., T.Y. Lin International, San Francisco, CA

IBC 19-51: Technical Challenges in Design of the Approach Viaducts of the New Samuel De Champlain Bridge
Zachary McGain, P.Eng., P.E., SYSTRA – IBT, Laval, QC; Sevak Demirdjian, SNC Lavalin, Quebec, Canada

IBC 19-52: Innovative Construction Means and Methods for the New Samuel De Champlain Bridge
Jeff Rogerson, P.Eng. and Gonzalo Osborne, P.Eng., P.E., PMP, Flatiron Construction Corporation, Ile-de-Sœurs (Verdun), QC Canada

IBC 19-53: Creation of an Elegant and Iconic New Frederick Douglass Memorial Bridge
Kenneth V. Butler, P.E., AECOM, Glen Allen, VA; Delmar D. Lytle and Richard W. Kenney, District DOT, Washington, DC; Eric Hayes, South Capitol Bridgebuilders, Washington, DC

IBC 19-54: Design and Erection Analysis of the New Frederick Douglass Memorial Bridge
Nathan M. Porter, P.E. and Eric T. Nelson, AECOM, Glen Allen, VA

Reviews

There are no reviews yet.

Be the first to review “IBC 19-48, 49, 50, 51, 52, 53, 54”

Your email address will not be published. Required fields are marked *

This site uses Akismet to reduce spam. Learn how your comment data is processed.