- This event has passed.
IBC Webinar
March 25, 2021 @ 12:00 pm - 1:00 pm
“Best of IBC” Webinar Series
The Best of IBC Webinar Series is a great way to preview the high quality technical content presented at the International Bridge Conference®.
Attendees can earn 1 pdh credit!
Virtual webinars are FREE to attend, but registration is required for pdh certification.
Topic: Accelerated Bridge Construction — Scroll Down to Register
IBC 20-08: EB Wilson Boulevard Bridge over Route 50: ABC Weekend Superstructure Replacement
Kelly Guild, P.E., WSP USA, Herndon, VA; John Michels, WSP USA, Herndon, VA; Alireza Hedayati, WSP USA, Herndon, VA; Vincente Valeza, Virginia DOT, Northern Virginia District, Fairfax, VA; Pooya Azar, Martins Construction Corporation, Falls Church, VA
In one of Northern Virginia’s busiest, most complicated and high traffic volume intersections, the superstructure of the EB Wilson Boulevard Bridge over Route 50 was demolished, removed, and replaced in a single weekend to minimize impact to the traveling public and local business community. The design utilized ABC methodology including three preconstructed composite units erected at the site using very early strength latex concrete deck closure pours providing the required cure time, strength and durability.
IBC 20-09: Wellsburg Bridge – Construction Methods and Float In
Charbel Raad, McNary Bergeron & Associates, Tampa, FL; Tim Davis, McNary Bergeron & Associates, Tampa, FL; Rob Brunner, Flatiron Construction, Wellsburg, WV
The Wellsburg Bridge is an 830-foot span basket-handle network tied arch connecting Wellsburg, WV and Brilliant, OH across the Ohio River. This arch span is being constructed using an Accelerated Bridge Construction method where the main span is built at a site roughly 1 mile upstream along the Ohio River and will be floated into its permanent position using a system of self-jacking falsework towers and barges.