IBC 2022 PDH Request Form Name First Last Email* Certificates will be sent to this email addressNY State Will be used for New York State Continuing Ed Requirements Florida State Will be used for Florida State Continuing Ed Requirements Please check the events that you attended at the 2022 IBC. Additional comments can be entered below. Monday, July 18, 2022 IBC 22-SS01: Bridging Kentucky, Design-Build IBC 22-SS03: Utah DOT Structures Digital Delivery IBC 22-SS04: PPC Overlays IBC 22-SS05: Introduction to Argo AI IBC 22-SS06: Preparing for the Future: PennDOTās Approach to Automated Vehicles IBC 22-SS07: Transitioning to a Smarter and More Sustainable Transportation System IBC 22-SS08: Multi-Jurisdictional Truck Platooning Demonstration IBC 22-SS09: BIM Delivery for Total Precast Accelerated Bridge Systems IBC 22-SS10: Advancing Digital Delivery: Bridging the Digital Data Gap at PennDOT IBC 22-SS11: BIM for Bridges and Structures IBC 22-SS12: The Value of āiāāA Steel Bridge Fabricatorās Perspective on BIM IBC 22-SS13: Learn why the Precast/Concrete Institute Funded Nonproprietary Ultra High-Performance Concrete (UHPC) Research IBC 22-SS14: Improving Bridge Assessment through the Integration of Conventional Visual Inspection and Non-Destructive Evaluation Data IBC 22-SS15: Depth to Bedrock Seismic Method Evaluation IBC 22-SS16: INDOT Bridge Research Program Keynote Session Featured Agency Session IBC 22-01: UHPC Repair of Steel Columns in the Walnut Tunnel in Philadelphia IBC 22-02: The Smart Hybrid Bridge ā Time to Innovate in Bridge Management Policy and Practice IBC 22-03: Cast-In-Place ABC Solution ā The InQuik Bridge System Technical and Projects IBC 22-04: Japanās Proven Solution to Prevent Unseating of Bridges During a Seismic Event IBC 22-05: Bridge Rehabilitation with Ultra-High Performance Concrete Bridge Overlays IBC 22-06: Structural Health Monitoring of the Canakkale Bridge in Turkey, the Largest Monitoring System for the Longer Bridge in the World W01: Transportation Welding Workshop Tuesday, July 19, 2022 IBC 22-07: OCCI Bridge Builder IBC 22-08: De Roche Creek Lateral Bridge Slide ā Easing Traffic Disruption & Improving Safety IBC 22-09: Accelerated Bridge Construction for the Long Island Railroad Mainline Expansion Project IBC 22-10: BNSF Railroad over the Central Tri-State Tollway (I-294) IBC 22-11: Doing ABC in Massachusetts. The Acceler-8 I-90 Bridge Replacements Project IBC 22-12: Using ABC Techniques and Innovative Design Details to Overcome Site Access Challenges IBC 22-13: Innovation, Teamwork and a 4 Day Closure ā Bunker Creek Bridge IBC 22-14: I-20 Value Engineering Study and Final Design IBC 22-15: Expanding the Metro System in Montreal, Viaducts and Bridges of RĆ©seau Express MĆ©tropolitan (REM) IBC 22-16: Separation of a Post-Tensioned Box Beam Bridge IBC 22-17: Bootstrapping Opportunities for Design in an Risk Led Context IBC 22-18: Closure Pour Innovations in Long-Span Concrete Bridges IBC 22-19: Bridge Aesthetics for Short Span Bridges Reflecting the Community: Case Studies for Two Aesthetic Driven Bridges IBC 22-20: 3GW1 Elevated Guideway Triangular Bridge for the Los Angeles World Airports People Mover IBC 22-21: Fatigue Testing in Negative Moment Region of a Continuous Stringer Bridge IBC 22-22: Diagnostic Load Testing of Ten Bridge-Class Culverts IBC 22-23: Construction and Live Load Behavior of a Skewed Steel I-Girder Bridge IBC 22-24: Health and Protection of Cable Stayed Bridges IBC 22-25: 83 Days ā The Hernando De Soto Bridge Repair IBC 22-26: Caltrans Load Rating of Complex Curved Steel Girder Bridges IBC 22-27: Reclassifying Fracture Critical Members to System Redundant Members in a steel Arch Bridge W02: Design Guidance for Routine Steel Girder Bridges W03: Bridge Load Rating and Posting: Understanding member resistance W04: BIM Workshop, Presented by Bentley Systems IBC Walking Tour IBC 22-28: Superstructure Modules at Bridges 3-155 N&S over Broadkill River, Sussex County, DE IBC 22-29: Prefabricated Bridge Decks ā Speed and Durability IBC 22-30: Exploring Fiber-Reinforced Polymer Concrete for Accelerated Bridge Construction Applications IBC 22-31: CMAR Delivery of I-15 Virgin River Bridge No. 1 ā Longest Steel Girder Span in Arizona IBC 22-32: Optimizing Bridge Design and Construction through Collaboration IBC 22-33: Hurricane Ida Emergency Repairs at the Route 22 Bridge over Middle Brook Wall Washout IBC 22-34: Rehabilitation of I-95 using the CM/GC Delivery Method IBC 22-35: Gordie Howe International Bridge: Project Overview and Design Features IBC 22-36: Replacement of the Kosciuszko Bridge over Newtown Creek Phase 2 ā Construction and Erection Engineering IBC 22-37: A record breaking prestressed concrete extradosed bridge IBC 22-38: Collapse of the Chirajara Cable Stayed Bridge in Colombia IBC 22-39: Varvsbron: a Unique Cable-Stayed Pedestrian Bridge IBC 22-40: Route 6/10 Interchange Reconstruction: Design & Construction of an Urban Interchange using Design/Build IBC 22-41: Fully Joint-less Continuous Steel Girder Structure ā Update and improvements after 7 years in service IBC 22-42: Steel Erection for the Margaret McDermott Pedestrian Bridges IBC 22-43: Designing the Pittsburgh Airport Terminal Front Bridge IBC 22-44: Changeable Wind Conditions Affecting Pedestrian Bridges IBC 22-45: Outside of the Comfort Zone ā When the Best Solution Makes a Client Uncomfortable IBC 22-46: Design and Construction of the Robert L.B. Tobin Land Bridge IBC 22-47: A Bascule Bridge Within a Bascule Bridge IBC 22-48: A Twist on Station Footbridge Design W05: Delivering Under Pressure ā Lessons Learned from Major Bridge Emergency Response and Rehabilitation Projects W06: How to Effectively Work With a DOT W11: Bridge Coating Contracts ā Quality Control vs Quality Assurance Wednesday, July 20, 2022 IBC 22-49: Use of Distributed Strain and Temperature Fiber Optic Monitoring on the West Seattle High Bridge IBC 22-50: Post-Tensioning Tendon Repairs of Two Segmental Concrete Bridges IBC 22-51: Innovative UHPC Mixing and Placing Techniques for Repair of Three Illinois Bridges IBC 22-52: Innovative Design of the Pulaski Skyway Rocker Bent Rehabilitation IBC 22-53: The Rehabilitation of Route 1ās Wayne Junction Viaduct IBC 22-54: Rehabilitation and Retrofit Design of a Historic Steel Truss Bridge in Virginia IBC 22-55: Rehabilitation of Arch Skewbacks, Viaduct Piers and Lower Level North Abutment at Henry Hudson Bridge IBC 22-56: Cable Inspection and Evaluation, Clinton Gateway Suspension Bridge IBC 22-57: Application of Negative Pressure at Exhaust Sleeves and Effects on Air Flow in Main Cables IBC 22-58: The Dublin Link Suspension Bridge Structural Cable System IBC 22-59: Suspension Span Link Replacement IBC 22-60: Richmond-San Rafael Bridge Gusset Plate Strengthening IBC 22-61: Smart Camber Analysis for close to 1,200 Precast Bridge Frames IBC 22-63: Complex Geometry Connects Communities IBC 22-64: Zinc Metallic Coatings for Bridge Corrosion Protection: How galvanizing, metalizing and duplex systems have become a game-changer in preserving steel surfaces IBC 22-65: Stay-In-Place-Fascia-Forms (SIPFF) ā a New Trend in Bridge Overhang Construction IBC 22-66: Design of the Golden Gate Bridge Main Suspension Span EDDs using Duplex Stainless Steel IBC 22-67: Two New Methods for Establishing Simple yet Durable Splicing of Prestressed Concrete Piles IBC 22-68: Advancing Foundations: Augered Cast-in-Place Bridge Foundations IBC 22-69: The West Mission Bay Drive Bridge: Challenges in Achieving Seismic Resistance in a Coastal Environment W07: Ground Improvement Techniques for Bridge Embankment Support W08: International Workshop IBC 22-70: Henry Hudson Bridge Rehabilitation IBC 22-71: Safe Lifting and Handling of Rebar Cages for Deep Foundations IBC 22-72: Rapid Partial Bridge Demolition of a Fractured Beam due to a Bridge Strike IBC 22-73: Engineering for Bridge Demolition ā The Need for Standardization IBC 22-74: Gantry Cranes Keep Vital Bridge Open During Complete Reconstruction IBC 22-75: Temporary Tower Wind Tongues and Rocker Links for the Benjamin Franklin Bridge IBC 22-76: Using 3D Models to Improve Bridge Design and Deliver Better Projects IBC 22-77: Rehabilitation of Decks in Post-Tensioned Box-Girder Bridges IBC 22-78: Launching Summit 8 Over Little Cuyahoga River ā Analytical Modeling IBC 22-79: Bridge Management Plans for Individual Bridges IBC 22-80: CSX 59th Street Terminal Bridge Program: Extending the Service Life of an Elevated Terminal IBC 22-81: Replacement of the TRRA Merchants Bridge Truss ā Face Lift for a 120 Year Old Bridge IBC 22-82: Evaluation of Cast-In-Place Open Spandrel Concrete Arch Bridges: Four Case Studies IBC 22-83: Evaluating Steel Bridge Details for Susceptibility to Constraint-Induced Fracture IBC 22-84: Inspection of the Worldās Longest Moveable Span, Ford Island Bridge, Pearl Harbor-Hickam, Hawaii IBC 22-85: Retrofits in Twin Tub Girder Bridges for System-level Redundancy IBC 22-86: Bridge Life Cycle Cost Savings Through Inspectability Design IBC 22-87: Investigation of Ground-Penetrating Radar, Impact Echo, and Infrared Thermography Methods to Detect Defects in Concrete Bridge Decks W09: Engineering for Structural Stability in Bridge Construction W10: Innovations Workshop (Various Presenters) Additional Options of Participation Speaker Session Chair Committee Member Paper Number Additional CommentsCertification* I confirm that I have attended the above checked sessions and would like them to be applied towards Professional Development Hours (PDH) credit issued through the Engineersā Society of Western Pennsylvania for my attendance at the 39th International Bridge ConferenceĀ®. Δ