Conference Archives
Past Proceedings and Technical Papers
To purchase papers and proceedings, use this form.
To find a specific topic, author or paper number, search the files or the excel table below:
Program Guides
Table of Contents
IBC 1991 – 2000
IBC 1984 – 1990
| International Bridge Conference Collection: Transportation Research Record: SAGE Journals
View articles in this Published Special Issue of Transportation Research Record journals.sagepub.com |
Books for Purchase
Reflections, Of the Greatest Bridge Engineers and Architects of the 20th and 21st Centuries written by Thomas Leech
Bridges…. Pittsburgh at the Point… A Journey Through History written by Thomas Leech and Linda Kaplan
IBC Technical Papers – 2019-2026
| Paper | Use Form Link above to Purchase | Paper Title | Author |
|---|---|---|---|
| IBC 26-106 | Not Published | Accelerated Bridge Construction for the McKinley Street Steel Network Tied Arch | Patrick Noble, PE, SE, COWI North America |
| IBC 26-105 | Innovative Engineering Solutions for the Pattullo Bridge Replacement North Approach Erection | Pavlo Voitenko, PE, COWI | |
| IBC 26-104 | Construction Engineering on the William Halton Parkway Twin Segmental Bridges | Ivan Liu, COWI North America | |
| IBC 26-103 | The Conrail Point-No-Point Bridge Transformation: Replacing a Century-Old Swing Span with a Modern Bascule | Brian Hillhouse, PE, Genesis Structures | |
| IBC 26-101 | Emergency Repairs to the Bayou Dularge Bascule Bridge | Jonathan Eberle, PE, AECOM | |
| IBC 26-100 | Replacement of Lifting Mechanism on 113 year Old Railroad Bridge | James Hyland, PE, GFT | |
| IBC 26-99 | Design of the North & South Channel Cable Stayed Bridge of the Bataan Cavite Interlink Bridge Project | Marwan Nader, PhD, PE, TYLin | |
| IBC 26-98 | The Bataan Cavite Interlink Bridge Project - Owners Perspective | Emil K. Sadain, CESO I, Department of Public Works & Highways | |
| IBC 26-96 | The 1915 Canakkale bridge - the world’s longest suspension bridge | Jesper Pihl, COWI | |
| IBC 26-95 | Innovative Methods for Installing Steel Casings on Below-Grade Piers and Piles: Case Studies of Showa Bridge and Chidori Railway Overpass | Yoshinao Kurachi, PE, JP, Oriental Shiraishi Corporation | |
| IBC 26-94 | Kruunusillat; Design and construction of Finland’s Longest Bridge | Tom Osborne, RIBA, Knight Architects | |
| IBC 26-93 | Galecopper Bridge: Safety Management and Replacement of Damaged Lock-Coil Cables | Mark Saliba, PE, Freyssinet | |
| IBC 26-92 | Advancing Structural Condition Assessment with Multimodal Sensor Fusion and Graph-Based Learning | Lawrencia Akuffo, Rowan University | |
| IBC 26-91 | Analysis and Rehabilitation of Roadway and Railway Masonry Arch Bridges | Brett Mattas, PE, SE, Michael Baker International | |
| IBC 26-90 | Load Rating of an Existing Steel Box Arch Rib Considering Local and Global Buckling Modes | Ryan Rapp, PE, SE, HNTB | |
| IBC 26-89 | TRB Journal | Comparison of Load Rating Methods for Complex Bridges: The Oceanic Bridge Case Study | Joseph Strafaci, PhD, MBA, PE, AICP, TYLin |
| IBC 26-88 | Load Rating of a Concrete Arch Bridge Without Available Plans | Jacob Behnke, PE, Collins Engineers, Inc | |
| IBC 26-87 | Load Rating of the Lofton Henderson Cantilevered Truss over the Black River | John Carey, PE, SE, Michael Baker International | |
| IBC 26-86 | Open Spandrel Arch Bridge: Refined modeling and strength analysis | Husam Hussein, PhD, PE, GFT | |
| IBC 26-85 | North Wilkesboro Motor Speedway Pedestrian Bridge | Ricky Tipton, GFT | |
| IBC 26-84 | Extending the Service Life of the Channel Five Bridge through Targeted Structural Rehabilitation and Corrosion Protection | Madison Lewis, Freyssinet, Inc. | |
| IBC 26-83 | Innovative Friction Collar Technique to Remove a Deteriorated Truss Pin | Michael Marks, PE, EIC Group LLC | |
| IBC 26-82 | Design of the Charlotte Douglas International Airport South Crossfield Taxiway Bridge | Jake Sherman, PE, SE, WSP USA | |
| IBC 26-81 | Opportunities for long span bridge replacements using concrete segmental. | Gregg Freeby, PE, American Segmental Bridge Institute | |
| IBC 26-80 | Design and Construction of the new Wellsburg Network Tied Arch Bridge over the Ohio River | Preston Vineyard, COWI | |
| IBC 26-79 | The Bellefonte Interchange: Design of Three Horizontally Curved-Girder Bridges | Nicholas Haraczy, PE, SAI Consulting Engineers, Inc. | |
| IBC 26-77 | The Brent Spence Companion Bridge - Creation of an Innovative Gateway | AJ Cardini, PE, SE, AECOM | |
| IBC 26-76 | Replacement of the Central Avenue Bridge over the Garden State Parkway | William Farrow III, PE, GPI | |
| IBC 26-75 | The Rehabilitation of the Dunlap Creek Bridge: America's First Cast Iron Bridge | Andrew Baumberger, GFT | |
| IBC 26-74 | Rehabilitation of the Historic English Center Bridge | Frank Artmont, PhD, PE, Modjeski and Masters, Inc. | |
| IBC 26-73 | Mitigation of Reinforcement Corrosion in a Historic Arch Bridge | Jeremy Smith, VCS Engineering, Inc. | |
| IBC 26-72 | Not Published | Rehabilitation of the Historic Simon Kenton Memorial Bridge | Joshua Pudleiner, AECOM |
| IBC 26-71 | The Buck O’Neil Bridge – Spanning the Missouri River with Kansas City’s Newest Urban Interchange | Michael Briggs, PE, SE, HNTB | |
| IBC 26-70 | Not Published | Design of the New Iowa 9 Mississippi River Truss Bridge at Lansing | Greg Hasbrouck, PE, Parsons |
| IBC 26-69 | Sliding a New Interstate Bridge: Design of the Commercial Street Bridge | Nicholas Burdette, PE, HDR | |
| IBC 26-68 | Design and Construction of I-80 Bridge over Nescopeck Creek - Major Bridge Replacement Project | Reshmi Lal, PE, PMP, Michael Baker International | |
| IBC 26-67 | Curved steel girders with Integral Post-Tensioned Concrete Cross-Girder | Robin Dominic, CDM Smith Inc. | |
| IBC 26-65 | Brockport Bicentennial Bridge | Lana Potapova, Arup | |
| IBC 26-64 | Restoring Connections: The Bancroft Pedestrian Bridge Replacement After Hurricane Ida | Barry Benton, PE, GPI | |
| IBC 26-63 | IL 59 Ped Bridge and Precast Boardwalk | Matthew Santeford, GFT | |
| IBC 26-62 | Continuous Curved Girder Highway Bridge Erection | Robert Cisneros, PE & PLS, High Steel Structures, LLC | |
| IBC 26-61 | Construction Equipment on Bridges | Ian Ebersole, PE, SE, Michels Corporation | |
| IBC 26-60 | Gordie Howe International Bridge - Long Reach Tower Crane Ties | Andrew Ritter, PE, GZA GeoEnvironmental, Inc.,d/b/a Siefert Associates | |
| IBC 26-59 | AI-Based Structural Optimisation of a Multi-Modal Swing Bridge | Benjamin Brunn, Ramboll | |
| IBC 26-58 | Not Published | Survival Analysis Framework for Remaining Fatigue Life Estimation in Steel Bridges | Farhad Farajiani, University of Wisconsin-Milwaukee |
| IBC 26-57 | Data-Driven Evaluation for Safe Passage of Permit Vehicles on District of Columbia Bridges | Dena Khatami, EXP US Services Inc. | |
| IBC 26-56 | Vessel Collision Warning System for Vulnerable Bridges - Case Studies | Scott Snelling, Roebling Labs LLC | |
| IBC 26-55 | Beyond BIM: Digital Twins for 3D Digital Project Deliverables | Alex Mabrich, Bentley Systems | |
| IBC 26-54 | Digital Workflow for Complex Urban Infrastructure — Model-Based Design and Coordination | Augustin Ceillier, Ramboll | |
| IBC 26-53 | Reconstruction of Pulaski Skyway Truss at Pier 98 | Gregory Ricks, HNTB | |
| IBC 26-52 | Theodore Roosevelt Bridge Case Study: Cathodic Protection for Service Life Extension | Alex Ball, Vector Corrosion Technologies | |
| IBC 26-51 | Northern New England’s First UHPC overlay | Adam Stockin, PE, WSP USA | |
| IBC 26-50 | Field Implementation and Monitoring of UHPC Gusset Plate Repair | Ryan Johns, EIT, University of Connecticut | |
| IBC 26-49 | Engineering Solutions for Jacking a 1200 Ton Truss Bridge for a Rocker Bearing Replacement | Shawn Throne, Modjeski and Masters | |
| IBC 26-48 | TRB Journal | Ultra-High-Performance Geopolymer Concrete for Bridge Applications: Advancing Sustainable Structural Performance | Hafiz Abdul Basit, University of Louisiana at Lafayette |
| IBC 26-47 | Optimal Approach for Addressing Reinforcement Corrosion of Bridge Decks and Improved Service Life with High Strength Corrosion Resistant Reinforcement | Hans Geber, CMC | |
| IBC 26-46 | Evaluating future options for the Seal Island Bridge | Dillon Betts, PhD, PE, P.Eng., ENV SP, COWI North America | |
| IBC 26-45 | Not Published | Data-Driven Evaluation of Internal Redundancy in Built-Up Steel Girders | Charles Kieffer III, Purdue University |
| IBC 26-44 | TRB Journal | A Dynamic-Analysis Workflow for Designing Bridge Piers to Resist Vessel Impact Loading | Gary Consolazio, University of Florida |
| IBC 26-43 | Not Published | Structural Redundancy Analysis for Continuous Steel Two-Girder Bridges: Evaluation of Capacity and Failure Modes | Cem Korkmaz, Purdue University |
| IBC 26-42 | Testing and Evaluation of Extreme Weather and Environmental Impact on FRP Rebar Tensile Strength | Amanda Bao, PhD, PE, Rochester Institute of Technology | |
| IBC 26-41 | Suspension Bridge Rehabilitation in the US and UK | Barry Colford, AECOM | |
| IBC 26-40 | Internal Suspension Cable Inspections of the Wayne Six Toll Bridge | Aaron Colorito, PE, Michael Baker International | |
| IBC 26-39 | Preserving an Icon: Main Cable Flow Testing for Long-Term Durability of the Bay Bridge West Span | Fady Bou-Shebel, TYLin | |
| IBC 26-38 | Brickyard –Seismic Analysis: True Pins for a Landslide | Gavin Viriyincy, PE, AECOM | |
| IBC 26-37 | Earthquake Resilience of the New Ölfusá Bridge: From Concept to Detailed Design | Smon Gren, Ramboll | |
| IBC 26-36 | Nonlinear Time-History Analysis of a Three-Tower Cable-Stayed Bridge in a High-Seismic Zone | Liyang Tian, Independent Researcher | |
| IBC 26-35 | Bolinas Bridge - Balancing Fault Rupture and Tsunami Design | Sebastian Varela, PhD, PE, SE, Mark Thomas | |
| IBC 26-34 | Pretty Rocks Slide Bridge | Randy Thomas, PE, Jacobs | |
| IBC 26-33 | Sacramento River Bridge Deck Replacement | Jordan Perlmutter, PE, Foothills Bridge Co | |
| IBC 26-32 | Erection of the Portal North Arch Bridges | Stephen Percassi Jr., Genesis Structures | |
| IBC 26-31 | Saint Joseph’s University Post Crossing – Connecting a University Campus Across a Major Urban Arterial | David Phelan, PE, Jacobs Engineering Group | |
| IBC 26-30 | Steel Bridge Playbook: Practical Tools and Resources for Contractors | Vin Bartucca, National Steel Bridge Alliance | |
| IBC 26-29 | I-475 Bridge Construction over Flint River near Flint, Michigan | Nikkolas Edgmond, PhD, PE, Genesis Structures | |
| IBC 26-28 | To Jamaica and Beyond: Launching the 150th Street Long Island Railroad Bridge | Lisa Briggs, Genesis Structures | |
| IBC 26-27 | From Condition to Consequence: An Impact-Based Approach to Bridge Infrastructure Prioritization | Matija Radovic, PhD, PE, Delaware DOT | |
| IBC 26-25 | IFC as Contractual Deliverable: A First in U.S. Infrastructure at French Creek | Hanjin Hu, Michael Baker International | |
| IBC 26-23 | AI-Assisted Bridge Design Automation and Building Intelligent Data | Venu Pokuri, PE, GFT | |
| IBC 26-22 | A Data Driven Approach to Predictive Deterioration Assessment in Long-Span Truss and Suspension Bridges | Ruel Sabellano, D. Eng., PE, M. ASCE, MDTA | |
| IBC 26-21 | Analytical twins: New criteria for evaluating “object modelers” in a digital twin world | Joshua Tauberer, LARSA, Inc. | |
| IBC 26-20 | A Case Study for a Bridge Girder Jacking System within Limited Working Space | Jeffrey Robert, PE, KCI Technologies | |
| IBC 26-19 | Reimagining steel repair: Unconventional Approach to Girder Rehabilitation | Rakesh Srinivas-Murthy, PE, WSP | |
| IBC 26-18 | Construction Engineering Innovations for the I-78 Open-Spandrel Arch Widening Project, Hamburg, Pennsylvania | Abir Sengupta, TYLin | |
| IBC 26-17 | San Francisco Oakland Bay Bridge Risk-Based Inspection and Cable Strength Evaluation | Sylwia Stawska, PhD, Modjeski and Masters Inc. | |
| IBC 26-16 | Railing Load Distribution in Girder-Slab Bridges | Bhushan Raj Selvaraj, PhD, 10-4 Engineering | |
| IBC 26-15 | Performance-Based Design of Temporary Jacking Frames and Supports for Major Bridge Rehabilitation | Qi Ye, PE, CHI Consulting Engineers | |
| IBC 26-13 | Integrating Steel Repairs into Comprehensive Painting Contracts, the Thomas J. Hatem Memorial Bridge | David Lynch, PE, H&H | |
| IBC 26-12 | From Dependence to Decision: Reducing Over-Reliance on AI Dialogue Systems Through Cognitive-Guided Interaction | Abhishek Khatiwada, Southern Illinois University Edwardsville | |
| IBC 26-11 | From Steel to Stewardship: Engineering Organizational Culture for Public Value | Michael Venuto, Delaware River Port Authority | |
| IBC 26-10 | Improving Safety in One Weekend: The River Road Railroad Bridge Replacement Project | Jack Cardinal, PE, SE, HNTB Corporation | |
| IBC 26-09 | Design-Build Services for the MTA Long Island Rail Road (LIRR) Hall Interlocking Expansion Project | Chih-Ping Frank Fan, PhD, PE, AECOM | |
| IBC 26-08 | The Rehabilitation of Five Bridges on SEPTA's Chestnut Hill East Line | Lee Wolfe, PE, GFT | |
| IBC 26-07 | Design and Construction Challenges Overcome for Partial Replacement of Baltimore Metro Pier 2720 | Karl Stegmann, PE, RK&K | |
| IBC 26-06 | Channel Monitoring Systems – A New Paradigm for Vessel Collision Risk Management | Matt Carter, Arup | |
| IBC 26-05 | Standardizing Speed - Modular TPGs for Rapid Span Replacement | Jansen Bundridge, PE, HNTB | |
| IBC 26-04 | Not Published | eBEAM140: Precision Beam Calculations, Simplified for Short Span Steel Bridges | Michael Barker, PhD, University of Wyoming |
| IBC 26-03 | Accelerated Bridge Construction Methods for the Replacement of Bridges 1-488N&S | Nicholas Dean, PE , M.C.E., Delaware DOT | |
| IBC 26-02 | Exploring the Design and Construction Challenges of an Accelerated Bridge Replacement: CR 571 Bridge over D&R Canal | Megan Fisher, WSP USA | |
| IBC 26-01 | Rapid Bridge Replacement After Devastating Floods: Designing for Sustainability and Resiliences | Steven Noble, CMC | InQuik Bridges | |
| IBC 25-85 | Not Published | Reconstruction of False Chord Truss Members on the Eastbound William Preston Lane, Jr. Memorial (Chesapeake Bay) Bridge | Jonathan Morey, P.E., WSP USA |
| IBC 25-84 | The New Storstrøm Bridge - erection methods, ship impacts and train runability | Peter Curran, C.Eng., Ramboll | |
| IBC 25-83 | The new Pattullo Bridge in Vancouver, B.C. | Martin Romberg, P.E., Leonhardt, Andrä und Partner | |
| IBC 25-82 | Design and Construction of Macau Bridge | Sidong Li, TYLin | |
| IBC 25-81 | Two Landmark Cable Stayed Bridges for Active Transport in Perth | Wolfram Schwarz, WSP | |
| IBC 25-80 | Incremental Launching of 256m Steel Box Girder Bridge on QEW highway over Credit River in Ontario | Hyunwoo Kim, P.Eng., AECOM | |
| IBC 25-79 | Predicting Girder Deflections for Phased Construction and Widening | Dusten Olds, P.E., HDR | |
| IBC 25-78 | Seismic Analysis and Design of a Curved Overpass in Guayaquil, Ecuador | Pedro P. Rojas, Ph.D., ESPOL Polytechnic University | |
| IBC 25-77 | Aerodynamic performance of cable-supported bridges during retrofit operations | Pierre-Olivier Dallaire, ing., P.Eng., RWDI | |
| IBC 25-76 | Not Published | Design and Construction of Raging River Bridge | Hasan Nikopour Deilami Ph.D., P.E., S.E., P.Eng., PMP, Stantec |
| IBC 25-75 | Not Published | The New AASHTO Risk-targeted Design Ground Motions | Thomas Murphy, Ph.D., P.E., S.E., Modjeski and Masters, Inc. |
| IBC 25-74 | Analytical Approach to the Erection Geometry of the Msikaba River Bridge | Heinrich van Wijk, P.E., AECOM | |
| IBC 25-73 | PennDOT’s FIRST Digitally Delivered Bridge Project | Joshua Mies, EIT, Pennoni | |
| IBC 25-72 | Abingdon Road Bridge Redefined | Ted Januszka, P.E., Pennoni | |
| IBC 25-71 | Unique Design and Construction of the Zaza River Bridge in Cuba | Jorge Suarez, P.E., F.ASCE, STV, Inc. | |
| IBC 25-70 | Renfrew Bridge - Glasgow's First Double Swing | Amanda Ruyack, P.E., H&H | |
| IBC 25-69 | Design of the Belden Bly Bascule Bridge | William Goulet, P.E., S.E., STV Incorporated | |
| IBC 25-68 | CSX Chickasaw Creek Swing Bridge Rehabilitation and Automation | Ryan Sullivan, PCL Civil Constructors | |
| IBC 25-67 | Multiple 52-hour Bridge Closures Eliminated with Strategic Workplanning | Zachary McKinley, E.I., PCL Construction, Inc. | |
| IBC 25-66 | CIP Segmental Design of the Beaver River Bridge | Matthew Adams, H&H | |
| IBC 25-65 | I-65 over Kentucky St. and Brook St. – System Redundancy of Three-Grider Integral Steel Straddle Bents | Joshua Carter, P.E., AECOM | |
| IBC 25-64 | Not Published | Horizontally Curved Steel I-Girder Bridge Cross-Frame Design Evaluation and Guideline Synthesis | Syed Muhammad Oan Naqvi, University of Texas Rio Grande Valley |
| IBC 25-63 | Not Published | Cast Steel Connections in Steel Bridges | Jennifer Pazdon, MSE, P.E., Cast Connex Corporation |
| IBC 25-62 | Not Published | Steel Bridge Design Resources for Efficient Conceptual Design Decisions | Brandon Chavel, National Steel Bridge Alliance |
| IBC 25-61 | Bearing Rehabilitation and Replacement on the Great Belt Link West Bridge | Andrew Smyth, Rambøll Danmark A/S | |
| IBC 25-60 | Extending Service Life to 200 Years: Insights from 30 Years of Optimizing Corrosion Sensor Use at the Great Belt Link | Peter Møller, Rambøll Danmark A/S | |
| IBC 25-59 | In-site testing data analysis of Kinmen bridge | ChinKuo Huang, China Engineering Consultant, Inc. | |
| IBC 25-58 | Truss Panels Replacement and Structural Monitoring, Pulaski Skyway Span 47 | Vincent Liang, GPI | |
| IBC 25-57 | HLMR Disk Bearings Applications of on Light Rail Structures | Ronald Watson, R. J. Watson, Inc. | |
| IBC 25-56 | Design and Construction of a Steel Gussetless Truss Bridge for Railroad Application | Juan Alfonso, P.E., HNTB | |
| IBC 25-55 | Park Avenue Viaduct Replacement – Analysis and Design, Pushing the Envelopes of Accelerated Construction | Firooz Panah, P.E., DBIA, AECOM | |
| IBC 25-54 | Railroad Bridge Live Load Impact Versus Train Speed: Field Test Evaluation | David Jacobs, Ph.D., P.E., University of Hartford | |
| IBC 25-53 | Recommendations for Numerical Modeling for Rail Structure Interaction Analysis | John Lobo, HDR | |
| IBC 25-52 | Not Published | Heat Straightening Practices | Ronnie Medlock, High Steel Structures, LLC |
| IBC 25-51 | Retrofitting for Longevity: Modification of In-Service Steel Box Girders to Facilitate Bridge Inspection and Maintenance | Y. Edward Zhou, AECOM | |
| IBC 25-50 | The US 50-Blue Mesa Bridge Emergency Repair | Nathan Schaeffer, P.E., Michael Baker International | |
| IBC 25-49 | James River Bridge - Main and Auxiliary Wire Rope Replacement | Austin Holub, P.E., PCL Construction, Inc. | |
| IBC 25-48 | Tying Two Nonredundant Steel Two-Girder Bridges Together with Floorbeams to Create a Single Bridge | John Sloan, AECOM | |
| IBC 25-47 | I-35 Haunched Slab Bridge Raises | Natalie McCombs, P.E., S.E., HNTB Corporation | |
| IBC 25-46 | Rebuilding the Lynchpin of American Commerce - the new I-70 Rocheport Bridge | Greg Hasbrouck, Parsons | |
| IBC 25-45 | Design and Construction of 3-Tower 4-Span Cable-stayed Mississippi River Bridge | Martin Furrer, P.E., S.E., Parsons | |
| IBC 25-44 | The wind design of the longest cable-stayed bridge in North America, the Gordie Howe International Bridge | Pierre-Olivier Dallaire, ing., P.Eng., RWDI | |
| IBC 25-43 | Modernizing Lawrence to Bryn Mawr with Segmental Box Girders for the Chicago Transit Authority | Emily Hereford, P.E., Stantec | |
| IBC 25-42 | The Brent Spence Bridge Corridor Project – A New Ohio River Crossing and Approach Structures | AJ Cardini, P.E., AECOM | |
| IBC 25-41 | Reconnecting communities: How capping the I-35 will change Austin, Texas for generations to come | Kasian Warenycia, P.E., Arup | |
| IBC 25-40 | Transforming a Decommissioned Marine Corps Elevated Causeway System (ELCAS) for Versatile Construction Access Solutions | Houston Brown, P.E., Pennoni | |
| IBC 25-39 | Planning and execution of bridge deck closures on the world's longest precast segmental span | Quentin Marzari, P.E., S.E., Arup | |
| IBC 25-38 | McClugage Bridge Tied Arch Span Construction and Float-In | John Boschert, P.E., S.E., Genesis Structures | |
| IBC 25-37 | Launched Construction of Simple-Span Structures for the Laredo-to-Nuevo Laredo Railroad Bridge over Rio Grande River | Ben Pendergrass, Ph.D., P.E., Genesis Structures | |
| IBC 25-36 | Design and Construction of an Airplane Carrying Bridge for MidAmerica Airport | Tony Shkurti, HNTB Corporation | |
| IBC 25-35 | Construction of the Hawk Falls Deck Arch | Josh Crain, Genesis Structures | |
| IBC 25-34 | Refined Load Rating of a Bridge with Unique Reinforced Concrete Arch and Stringer-Floorbeam Spans | Lung-Yang Lai, Ph.D., P.E., S.E., Specialty Engineering, Inc. | |
| IBC 25-33 | Fatigue Assessment of Long Span Steel Bridges | Neerajkumar Desai, Associated Engineering Consultants | |
| IBC 25-32 | A Bridge Widening at an MSE Retaining Wall Conflict | Cory Shipman, P.E., HDR | |
| IBC 25-31 | Inspection of Modern Stay Cable Systems | Mark Saliba, P.E., Freysinet Inc. | |
| IBC 25-30 | The Mast: Designing a Signature Cable Stayed Pedestrian Bridge | Hunter Ruthrauff, TYLin | |
| IBC 25-29 | Reprofiling of An Existing Cable Stayed Bridge - US 17/SR 404 SPUR BRIDGE | Meng Sun, P.E., S.E., Parsons Transportation Group | |
| IBC 25-28 | Not Published | CTA Harlem Transit Station Bus Bridge Replacement - Multi Discipline, Design, Construction & Innovation | Irsilia Colletti, P.E., S.E., HNTB |
| IBC 25-27 | Yellowstone River Bridge Replacement – Unique Solutions in a Unique Environment | Bob Sward, P.E., Structural Technologies, LLC | |
| IBC 25-26 | Pier Replacement with Temporary Crash Wall | Gregory Stolowski, P.E., WSP USA | |
| IBC 25-25 | Adaptive Reuse of the Historic Mount Carbon Bowstring Truss | Brian Teles, P.E., GFT | |
| IBC 25-24 | Rehabilitation of the Historic Monument Place Bridge | Matthew Bunner, HDR | |
| IBC 25-23 | Historic Route 66 Bridgeport Bridge Rehabilitation | David Neuhauser, P.E., STV, Inc. | |
| IBC 25-22 | A New Iconic Bridge for Brisbane | Thomas Cooper, WSP | |
| IBC 25-21 | Integrated Construction Methods of Cable-Stay Pedestrian Bridges | Matthew Cardamone, PKF Mark III Inc. | |
| IBC 25-20 | Schuylkill River Trail Cable-Stayed Pedestrian Bridge | Trevor Kirkpatrick, AECOM | |
| IBC 25-19 | ESCR Tied Arch Pedestrian Bridges | Silvio Garcia, H&H | |
| IBC 25-18 | Portage Bay – A segmental bridge built in an active landslide | Bradford Shaffer, P.E., S.E., AECOM | |
| IBC 25-17 | Greater Cleveland Regional Transit Authority Waterfront Line Bridge Rehabilitation | Howard Swanson, P.E., S.E., H&H | |
| IBC 25-16 | LRFR Load Rating of Horizontally Curved Composite Steel Tub-Girder Bridges: An Illustrations | Paul Biju-Duval, Finite Element Analysis Ltd. | |
| IBC 25-15 | Suicide Deterrents Save Lives | David Konz, F.SEI, P.E., S.E., AtkinsRéalis | |
| IBC 25-14 | Underwater Concrete Repairs on the Eastbound William Preston Lane, Jr. Memorial (Chesapeake Bay) Bridge | Ruel Sabellano, D.Eng., P.E., M.ASCE, Maryland Transportation Authority | |
| IBC 25-13 | Chesapeake Bay Bridge Deck Replacement Using Accelerated Bridge Construction | Tekeste Amare, P.E., Maryland Transportation Authority | |
| IBC 25-12 | Crawford Avenue Bridge Rehabilitation - They don’t make them like they used to and that’s okay. | Matt Pierce, P.E., Benesch | |
| IBC 25-11 | Increasing Interstate Vertical Clearances in an Urban Environment | Scott Fisher, Virginia DOT | |
| IBC 25-10 | Repairs to the Historic Tombigee River Hwy 182 Bridge | Joe Knapp, P.E., Genesis Structures | |
| IBC 25-09 | Sonoma Marin Area Rail Transit – Precast Bridge 16.86 over San Rafael Creek (San Rafael, CA) | Brian Olp, P.E., S.E., STV | |
| IBC 25-08 | Accelerated bridge construction including helical pile for a railroad truss replacement in an urban environment | Allen Smith, P.E., S.E., Crawford, Murphy and Tilly | |
| IBC 25-07 | Leveraging ABC Techniques for Weekend Bridge Replacements: A Case Study in Traffic Management and Efficiency | Joseph Tierney, P.E., GFT | |
| IBC 25-06 | A Case Study on the Replacement of OSPD Deck Panels on an Existing Suspension Bridge | Dillon Betts, Ph.D., P.E., P.Eng., COWI North America | |
| IBC 25-05 | Constructing the Benjamin Franklin Bridge’s Dehumidification System | Joshua Pudleiner, P.E., AECOM | |
| IBC 25-04 | NDT-inspection and Initial Residual Service Life Assessment of the Lysefjord Suspension bridge with more than 2000 Main Cable Wire Breaks | Tobias Friis, Ramboll | |
| IBC 25-03 | Buck O’Neil Bridge Demolition | Steve Eads Jr., P.E., Genesis Structures | |
| IBC 25-02 | Demolition of the I64 Truss over the Kanawha River using Strand Jacking and Balanced Cantilever Demolition | Peter Quinn, Tunstall Engineering Group | |
| IBC 25-01 | Demolition 101: An Introductory Guide to the Bridge Removal Process | Jacob Behnke, Collins Engineers, Inc. | |
| IBC 24-86 | Brim Based Geometry Control in Cable Stayed Bridge Construction | Atte Mikkonen, SOFiN Consulting | |
| IBC 24-85 | Evaluation, Design and Implemantation of a Holistic Repair Strategy to Extend the Service Life of the Post-Tensioned I-526 Wando River Bridge | David Whitmore, P.Eng., Vector Corrosion Technologies | |
| IBC 24-84 | Not Published | Waxed Tendons for Fort Walton Beach Bridge Replacement Project | Christopher Vanek, P.E., WSP USA |
| IBC 24-83 | Not Published | Standard Designs and Plans for Modern Steel Highway Bridges | Francesco Russo, Russo Structural Services LLC |
| IBC 24-82 | Not Published | Efficient Design of Modern Steel Highway Bridges | Francesco Russo, Russo Structural Services LLC |
| IBC 24-81 | Record Setting I-64 Kanawha River Bridge | Jason Fuller, HDR | |
| IBC 24-80 | Sequenced Removal of the Non-Redundant I-30 Bridge | Steve Eads, Genesis Structures | |
| IBC 24-79 | Engineering and Execution of the I-74 Mississippi River Bridge Removal | Thomas Schebler, EIT, Helm Civil | |
| IBC 24-78 | Demolition Challenges of the Harry W Nice/Thomas “Mac” Middleton Bridge | Nikkolas Edgmond, E.I., Genesis Structures | |
| IBC 24-77 | A Case Study on Retrofitting of a Box Girder Bridge with CFRP and External Tendons | Chun-Chung Chen, Ph.D., S.E., National Center for Research on Earthquake Engineering | |
| IBC 24-76 | Not Published | Rigid-Frame Bridge Seismic Retrofits on TransCanada Highway | Kai Marder, P.Eng., TYLin |
| IBC 24-75 | Deck Removal for the I-75 Bridge over the Rouge River | John Boschert, P.E., S.E., Genesis Structures | |
| IBC 24-74 | Replacement of Norfolk Southern Bridge N-680.20 over North Court Street in Circleville, Ohio | Edward Baznik, P.E., Michael Baker International | |
| IBC 24-73 | Valley of the Dons – Utilizing Long Span Segmental Bridges over the Environmentally Sensitive Terrain of the Don River Valley | Nickolas Hatinger, P.E., S.E., P. Eng., HDR | |
| IBC 24-72 | 120 Year Old Truss Replacement with 187' TPG Span | Zach McKinley, E.I., PCL Construction, Inc. | |
| IBC 24-71 | Streamlining Infrastructure: Box Jacking for Trenchless Underpasses in North America | Alex Belenguer, P.E., McNary Bergeron & Associates | |
| IBC 24-70 | New Tricks Used to Rehabilitate an Old Arch Bridge | Steve Olson, Ph.D., P.E., Olson & Nesvold Engineers, PSC | |
| IBC 24-69 | Not Published | Design of the Hawk Falls Arch Bridge | Thomas Murphy, Ph.D., P.E., S.E., Modjeski and Masters |
| IBC 24-68 | Engineering for Bridge Demolition – Recommended Best Practices | Samantha Kevern, P.E., S.E., Foothills Bridge Co. | |
| IBC 24-67 | Not Published | Innovative Hanger Replacement for the Sherman Minton Bridge | Blaise Blabac, P.E., Modjeski and Masters |
| IBC 24-66 | Not Published | Constructability Reviews - an invaluable part of the process. | Gary M. Dinmore, P.E., Dinmore Engineering |
| IBC 24-65 | Don't Judge a Bridge by Its Span Length: West Montgomery Avenue Bridge Replacement Project | Adam Bagriacik, P.E., Modjeski and Masters | |
| IBC 24-64 | Value Engineered Solution for the Replacement of a Highly Skewed Heavily Traveled Urban Bridge | Zhuo Wen (Zeus) Wu, EIC Group LLC | |
| IBC 24-63 | The Replacement of the Park Avenue Viaduct: Micropile Foundations and Innovative Construction Techniques | Arsanious Guirguis, P.E., H&H | |
| IBC 24-62 | Not Published | Parameter-Driven Creation of 2D Traditional Style Drawings, 3D Models, and Analytical Models: A Quantum Leap in Efficiency | Douglas Dunrud, P.E., WSP USA |
| IBC 24-61 | Not Published | Transitioning the Nation's largest bridge inventory to Digital Delivery | Daniel Jensen, Michael Baker International |
| IBC 24-60 | Not Published | The Digital Puzzle: Working Together to Implement BIM Standards | Joseph Brenner, P.E., Michael Baker International |
| IBC 24-59 | Pennsylvania Turnpike Commission: Pilot 3D Bridge Model Project | Dan Rogers, P.E., RETTEW Associates, Inc. | |
| IBC 24-58 | Inspection, Evaluation, and Rehabilitation of the Taylor Bridge Gusset Plates | Kai Marder, P.Eng., TYLin | |
| IBC 24-57 | An Investigative Study on Extensive Transverse Deck Cracking – Two Twin Bridges | George Zimmer P.E., ENV SP, WSP USA | |
| IBC 24-56 | City of Pittsburgh Comprehensive Bridge Asset Management Program Overview | Louis Ruzzi, P.E., CBSI, NCTI, WSP USA | |
| IBC 24-55 | Curved, Variable Depth, Propped Cantilever, Post-Tensioned Bridge | Dean Van Landuyt, P.E., AEC, A TYLin Company | |
| IBC 24-54 | Not Published | The Nancy Pauw timber shallow-arch footbridge | Leon Treder, P.E., StructureCraft |
| IBC 24-53 | An S-Curved Tied Arch – An Overnight Success: Design and Construction of the Northaven Trail Pedestrian Bridge | Gregor Wollmann, HNTB | |
| IBC 24-52 | Innovative Construction for a Complex Site | Kevin Heffern, P.E., S.E., Burns & McDonnell | |
| IBC 24-51 | Complex Steel Erection Procedure for Curved Girders and Substantial Simple Spans | Sean Kennedy, EIC Group LLC | |
| IBC 24-50 | Not Published | Shop Assembly and Steel Erection on the New Nice/Middleton Bridge | Ronnie Medlock, High Steel Structures, LLC |
| IBC 24-49 | Collaboration to address Construction Challenges – The Loxahatchee River Bridge Rehabilitation | Steven Shaup, P.E., TranSystems | |
| IBC 24-48 | Not Published | Vehicle Collision Repairs to an Overhead Counterweight Rolling Lift Bridge | Jonathan Eberle, AECOM |
| IBC 24-47 | High Rise Bridge Grid Deck Replacement and Structural Repairs | Deanna Nevling, HDR | |
| IBC 24-46 | The Value of Value Engineering | Austin Spencer, P.E., Pennoni | |
| IBC 24-45 | New River Draw Bridge Design and Analysis for Cooper E80 Locomotive Loads | Aravinda Ramakrishna, P.E., Hardesty & Hanover | |
| IBC 24-44 | Widening an Interprovincial Bridge over the Ottawa River | Ryan O'Connell, P.Eng., Parsons | |
| IBC 24-43 | Pittsburgh International Airport Terminal Modernization - Construction overview and opening preview | Kevin O'Connor, HDR | |
| IBC 24-42 | Not Published | Bridge Rehabilitation in the Heart of Our Nation’s Capital | Ahmad Faqiri, HDR |
| IBC 24-41 | Jane Byrne Interchange: Complex Interchange in Historic Urban Environment | Matthew Santeford, P.E., S.E., TranSystems | |
| IBC 24-40 | Walk Bridge Project : The design journey of replacing a historic movable rail bridge in a busy Northeast Corridor, from bridge type selections to creating an aesthetic structure reflecting the community of Norwalk, Connecticut | Jesse Miguel, AIA, NCARB, ENV SP, HNTB | |
| IBC 24-39 | Not Published | Falls Creek Bridge: Accelerated Bridge Construction With Precast, Launching and Lateral Sliding | Murray Johnson, P.Eng., Stantec |
| IBC 24-38 | Not Published | Falls Creek Bridge: Design For a Mountainous Site Washed Out by Atmospheric River | Borja Alverez, P.Eng., Stantec |
| IBC 24-37 | Bringing New Life to an Old Bridge through Effective Teamwork | Andrew Goodrich, P.E., Burgess & Niple | |
| IBC 24-36 | Rehabilitation of the Historic Union Bridge over the Ottawa River | Amer Hammoud, M.A.Sc., P.Eng., Parsons | |
| IBC 24-35 | Not Published | Suspended Truss Span Rehabilitation of Wind Shear Devices | Greg Roby, P.E., Stantec |
| IBC 24-34 | Design of the Main Span for the Bogota MRT Line Viaduct | Rajan Chaurasia, P.Eng., WSP Canada | |
| IBC 24-33 | Rehabilitation of the LA 47 over Intracoastal Waterway Gulf Outlet | Michael Paul, TRC Engineers, Inc. | |
| IBC 24-32 | Not Published | Existing Pier Evaluation using Non-Linear Composite Concrete Modeling | Tony Shkurti, Ph.D., P.E., S.E., HNTB Corporation |
| IBC 24-31 | Data-Driven Preventive Maintenance and Service Life Increase of the Sunshine Skyway Bridge – Tampa FL, USA. | Ivan Gualtero, P.E., TYLin | |
| IBC 24-30 | Pocket Track Viaduct Pier Strengthening and Rehabilitation | Bradford Shaffer, P.E., S.E., AECOM | |
| IBC 24-29 | Triple I-Girder, Integral Steel Straddle Bent Application for I-10/US69 Beaumont Eastex | Ahmed Rageh, Ph.D., P.E., Volkert | |
| IBC 24-28 | High-Load Jacking for Truss Bearing Replacement at the Pulaski Skyway | Qi Ye, P.E., CHI Consulting Engineers | |
| IBC 24-27 | Brightline Trains Florida: Rail Structure and Construction Innovations over 160 miles of Railroad | Ryan Rapp, P.E., S.E., HNTB | |
| IBC 24-26 | Construction of the US 60 Bridge over the Cumberland River | Taylor Perkins, Ph.D., P.E., S.E., Stantec | |
| IBC 24-25 | Completion of First UHPC Deck Rehabilitation on Entire Suspension Bridge | Sam Boukaram, P.E., WSP USA | |
| IBC 24-24 | Deck Replacement and Strengthening of the Throgs Neck Bridge | Roger Haight, P.E., ENV SP, WSP USA | |
| IBC 24-23 | Proposed Improvements to North American Main Cable Dehumidification Systems | Jonathan Morey, P.E., WSP USA | |
| IBC 24-22 | An Overview of the I-95 Bridge Collapse, Emergency Repairs, and Bridge Replacement | Joseph Sirignano, P.E., VMA, Benesch | |
| IBC 24-21 | Predicting Bridge Health: Machine Learning-Based Condition Rating from Element-Level Inspections | Zeinab Bandpey, Morgan State University | |
| IBC 24-20 | Preliminary Fatigue Evaluation of a 100-Year-old Double Level Bridge | Richard Stevens, P.E., Hardesty & Hanover | |
| IBC 24-19 | Protection Level 3 application on Internal PT for large precast segmental bridge | Alban Drouault, VSL International | |
| IBC 24-18 | I-395 Signature Bridge - Construction Engineering of Precast Arches and Stayed Spans | Harry McElroy, P.E., McNary Bergeron and Johannesen | |
| IBC 24-17 | Case Study of the Rehabilitation and Preservation of Two Ohio River Cable Stay Bridges | Dallas Montgomery P.E., P.L.S., ASTM-PTI, Burgess & Niple, Inc. | |
| IBC 24-16 | Construction engineering of the US 181 Harbor Bridge Replacement main spans | Quentin Marzari, P.E., S.E., Arup | |
| IBC 24-15 | Load Rating of The Gerald Desmond Bridge | Javier Campos, P.E., S.E., Arup | |
| IBC 24-14 | Can the Application of Higher Strength and Corrosion Resistant Reinforcement Improve the Crack Control Performance of Bridge Decks and Provide Improved Durability and Service-Life? An Illinois DOT Case Study will be Presented. | Salem Faza, Ph.D., CMC | |
| IBC 24-13 | Industry Engagement Survey for UHPC Beam End Encasement Options for the Construction of New Steel Bridges | Brian Lassy, E.I.T., University of Connecticut | |
| IBC 24-12 | Performance of Carbon Fiber Strand in a Maine Cable Stay Bridge | Jeff Folsom, P.E., Maine DOT | |
| IBC 24-11 | Not Published | Strengthening of White Bayou Bridge with FRP Composites | Vijaya Gopu, Ph.D., P.E., LTRC & University of Louisiana |
| IBC 24-10 | Rehabilitation of the 1870/1914 Waco Suspension Bridge | Patrick Sparks, P.E., Sparks Engineering, Inc. | |
| IBC 24-09 | Suspension Bridge Rehabilitation and Preservation Constructability Challenges | Joshua Pudleiner, P.E., STSC, AECOM | |
| IBC 24-08 | Repair & Rehabilitation of Historic Suspension Bridges Great & Small | Benjamin Reeve, P.E., Structural Technologies | |
| IBC 24-07 | Pittsburgh's Three Sisters Bridges Rehabilitation-Historic Bridge Rehabilitation Lessons Learned | Aaron Colorito, P.E., Michael Baker International | |
| IBC 24-06 | Implementing F3148 Fixed Spline Fastening and The Combined Method | Jeff Greene, LeJeune Bolt Company | |
| IBC 24-05 | Not Published | Two Coat Inorganic Coating System for Steel Bridges | Kristen Blankenship, Carboline |
| IBC 24-04 | Leveraging UAS, AI, and Digital Twin Technology to Transform Bridge Inspection: Robert Street Bridge | Scott Becher, Bentley Systems | |
| IBC 24-03 | Not Published | Fibre Composite Pedestrian Bridges on the Dominion Trail | Michael Kemp, Wagners CFT |
| IBC 24-02 | Not Published | Lateral Slide of Permanent Panel Bridges to Minimize Traffic Impact | Michael Parciasepe, Acrow |
| IBC 24-01 | High Load Multi-Rotational Disk bearings for the Skillman Street Arch Bridge | Ronald Watson, R. J. Watson, Inc. | |
| IBC 23-85 | Rt. 30 over Beach Thorofare – Rehabilitation of an Historic Complex Single Leaf Bascule Bridge | George Zimmer, P.E., ENV SP, WSP USA | |
| IBC 23-84 | Not Published | Rehabilitation of the Detroit-Superior Bridge, Cleveland, Ohio | William Vermes, This Old Bridge |
| IBC 23-83 | Emergency Repairs and Road Diet at the Rt.71/Shark River bridge | Rama Krishnagiri, WSP USA | |
| IBC 23-82 | Infrastructure for People and Planet – Bridging the LA River | Taylor Yard Bikeway and Pedestrian Bridge Design and Construction | Scott Lenz, Arup | |
| IBC 23-81 | I-84 Twin Bridges Project | Benjamin Martz, P.E., CDR Maguire | |
| IBC 23-80 | Construction of the Wekiva Parkway Section 6 | Robert Bennett, P.E., RS&H | |
| IBC 23-79 | New Champlain Bridge over the Saint Lawrence river in Montreal. Design of the temporary works for the construction of the cable-stayed bridge | Alejandro Pérez Caldentey, P.E., FHECOR North America | |
| IBC 23-78 | Old Champlain Bridge Deconstruction | Wade Pottie, P.E., P.Eng., Harbourside Engineering Consultants | |
| IBC 23-77 | Erection Procedure of the Mile Long Bridge | Michael Haas, P.E., S.E., Collins Engineers, Inc. | |
| IBC 23-76 | NJDOT’s approach to Risk-based Asset Management and Prioritization | Rama Krishnagiri, WSP USA | |
| IBC 23-75 | Load Rating the Denison Harvard Bridge: A Hybrid Approach for Complex Superstructures | Aaron Englehart, P.E., Michael Baker International | |
| IBC 23-74 | Structural Health Monitoring of the Great Belt Suspension Bridge and the Benefits for Operation and Maintenance | Tobias Friis, Rambøll Danmark A/S | |
| IBC 23-73 | Galecopperbridge - Stay Cable Replacement in Traffic | Dimitri Tuinstra, Arup | |
| IBC 23-72 | Preliminary Design of the New Ile d’Orleans Bridge | Simon Gren, M.Sc.Eng., Ramboll | |
| IBC 23-71 | The Design and Construction of the New Storstrøm Bridge | Luca Cargnino, M.Sc. Eng, Ramboll | |
| IBC 23-70 | Dynamic Amplification of Light Rail Vehicle Derailment Impact on Bridge | Nicholas Catella, Simpson Gumpertz & Heger, Inc. | |
| IBC 23-69 | John Lewis Memorial Bridge, A Case Study in Alternative Delivery Methods | Eric Birkhauser, Donald MacDonald Bridge Architects LLP | |
| IBC 23-68 | Noncontact Lap Splices of Large Hooked Reinforcing Bars | Zachary Coleman, Virginia Tech | |
| IBC 23-67 | A Case Study on Curved Fully Integral Abutment Bridge Thermal Deformation: I-390 over I-490 | Amanda Bao, Ph.D., P.E., Rochester Institute of Technology | |
| IBC 23-66 | Not Published | Long-Term Field Response of Skewed Steel I-Girder Bridge Superstructures | Siang Zhou, Ph.D., University of Illinois Urbana-Champaign |
| IBC 23-65 | Not Published | Program Management of the Chesapeake Bay Bridge | Jonathan Morey, P.E., WSP USA |
| IBC 23-64 | Development of MDTA Software Tool – the Bridge Asset Management Program (BAMP) | Y. Edward Zhou, AECOM | |
| IBC 23-63 | Load Rating of A CIP Open Spandrel Arch Bridge with Curved Widening and Offset Traffic Pattern Using Refined Method of Analysis in Virginia | Soroush Fakhri Yazdi, P.E., WSP USA | |
| IBC 23-62 | Accelerated Design for Accelerated Construction: Emergency Superstructure Replacement in Tallahassee, Florida | Richard Schoedel, P.E., Michael Baker International | |
| IBC 23-61 | State of the Art and Current Practice on Rail-Structure Interaction in North America | Ying Tan, Ph.D., P.E., HDR | |
| IBC 23-60 | Utilizing Innovative Construction Access Design to Minimize Rail Traffic Disruptions | Austin Holub, P.E., PCL Civil Constructors, Inc. | |
| IBC 23-59 | Not Published | AREMA/NSBA Collaboration Steel Railroad Bridge Constructability Design Guide | Brandon Chavel, Ph.D., P.E., Michael Baker International |
| IBC 23-58 | Design and Construction Challenges of the Main Span and East Approach Replacement/Retrofit of TRRA Merchants Bridge over Mississippi River | Nick Staroski, P.E., S.E., TranSystems | |
| IBC 23-57 | Technical Challenges in Design of the Kingston Third Crossing Signature Span | Edouard Renneville, Eng., SYSTRA IBT | |
| IBC 23-56 | Alternative Technical Concept for the Chicago Transit Authority’s Red and Purple Modernization Phase One Project | Emily Hereford, P.E., Stantec | |
| IBC 23-55 | Fern Hollow Bridge Emergency Replacement Design-Build | Jason Fuller, P.E., HDR | |
| IBC 23-54 | Not Published | History Matters: Compatible Bridge Design in Historic Districts | Michael Cuddy, P.E., TranSystems |
| IBC 23-53 | SR 0095 over Tacony and Bridge Street: Curved Girder viaduct with Integral Post-tensioned Concrete Cross-Girder | Tyler Kerstetter, CDM Smith | |
| IBC 23-52 | Balanced Cantilever Construction in Alberta | Myles Lewis, P.Eng., Stantec | |
| IBC 23-51 | Rebuilding an Urban Viaduct at the Speed of Segmental | Eric Johnson, Corven Engineering, a H&H Company | |
| IBC 23-50 | Urban Infrastructure Improvement Focused on the Community | Matthew Adams, P.E., Hardesty & Hanover | |
| IBC 23-49 | Accelerated Rehabilitation of a Masonry Arch Bridge | William Goulet, STV Incorporated | |
| IBC 23-48 | Bryn Mawr Avenue Bridges - Rehabilitating Small & Unique Historic Structures | Margaret Sherman, P.E., TranSystems | |
| IBC 23-47 | Rehabilitation and lifetime extension deteriorated bascule bridge by Digital Enabled Asset Management | Torben Bilgrav Bangsgaard, Rambøll Danmark A/S | |
| IBC 23-46 | The Safe Harbor Trestle Bridge Rehabilitation Project | David Hoglund, P.E., RETTEW Associates | |
| IBC 23-45 | Design and Construction of Fatigue-Prone Detail Retrofits and Corrosion Repairs for Interstate 79 Neville Island Bridge | Jason DeFlitch, P.E., SAI Consulting Engineers | |
| IBC 23-44 | Successful Rehabilitation of the Fatigue Cracking Problems developed in the I-64 Delta Frames over the Maury River in Virginia. | Loai El-Gazairly, Ph.D., P.E., Whitman, Requardt and Associates | |
| IBC 23-43 | Design and Construction of the Ravensdale Road Bridge | Matthew Cochran, P.E., H.W. Lochner, Inc. | |
| IBC 23-42 | Overview of the new FHWA Bridge Geometry Manual | Thomas Eberhardt Jr., P.E., HDR | |
| IBC 23-41 | Design and Construction of the New Harry W. Nice / Thomas "Mac" Middleton Bridge | Stephen Matty, AECOM | |
| IBC 23-40 | The Good, The Bad, & The Ugly: Long, Phased & Highly Skewed Steel Bridge | Eric Dues, P.E., S.E., Gannett Fleming | |
| IBC 23-39 | Bridge over Fossvogur | Keith Brownlie, RIBA AIA Intl' Assoc., BEAM Architects | |
| IBC 23-38 | Final Design and Uplift Mitigation for a 300' radius Steel Curved Girder Bridge | Daniel Baxter, P.E., S.E., Michael Baker International | |
| IBC 23-37 | Keep Traffic Moving on the Benjamin Franklin Bridge | Qi Ye, P.E., CHI Consulting Engineers, LLC | |
| IBC 23-36 | Construction Innovation on India’s Longest Sea-crossing Mumbai Trans Harbour Link (MTHL) | Hohsing Lee, P.E., S.E., AECOM | |
| IBC 23-35 | Innovative Construction of the Gambo Creek Bridge through Engineering and Contractor Collaboration | Michael Izzo, P.E., Whitney, Bailey, Cox & Magnani, LLC | |
| IBC 23-34 | Transportation and Erection of Four Steel Arch Bridges | Thomas McNutt, P.E., P.Eng., Harbourside Engineering Consultants | |
| IBC 23-33 | Strand Jacking of the I-64 Westbound Steel Girder Bridge over the Kanawha River | Peter Quinn, P.E., Tunstall Engineering Group | |
| IBC 23-32 | Unique Girder Erection Techniques for Difficult Site Conditions in Kicking Horse Canyon | Brian Witte, P.Eng., P.E., Parsons | |
| IBC 23-31 | Database driven design of a large-scale bridge | Sean LeCoultre, P.E., Ramboll Finland Oy | |
| IBC 23-30 | 3D Modeling: Complex Bridge Construction and Emergency Repairs | Zacharie Stonestreet, E.I.T., Michael Baker International | |
| IBC 23-29 | Bridging the Digital Divide | Joe Brenner, P.E., Michael Baker International | |
| IBC 23-28 | A People-First Approach to a Modular FRP Pedestrian Bridge | Thomas Osborne, RIBA, Knight Architects | |
| IBC 23-27 | Park Union Bridge - Complex Pedestrian Bridge Design and Analysis | Lana Potapova, B.Eng., M.Eng., P.E., Arup | |
| IBC 23-26 | Not Published | An Engineered Timber Bridge for the Seven First Nations | Vanessa Wan, P.Eng., M.Eng., Stantec |
| IBC 23-25 | Making Connections at Phoenix Sky Harbor International Airport | Jennifer Whiteside, P.E., Gannett Fleming | |
| IBC 23-24 | A Very Rapid Bridge Replacement | Yen Wu, P.E., MASc., Arup | |
| IBC 23-23 | ABC Widening of I-376 Westbound Bridge using Precast Elements | Jason DeFlitch, P.E., SAI Consulting Engineers | |
| IBC 23-22 | Accelerated Construction of Unbraced Network Arch Bridge Using SPMTs | Mike LaViolette, HDR | |
| IBC 23-21 | I-895 over Herring Run – Erosion & Scour Mitigation | Laura Magoon, P.E., RK&K, LLP | |
| IBC 23-20 | Delivering Value and Resiliency in Bridge and Foundation River Construction | Gregory Ricks, P.E., HNTB | |
| IBC 23-19 | Not Published | Alternative Approach to Design for High Shear Demands in Rock Sockets | Lawrence Rolwes, Jr., HNTB |
| IBC 23-18 | Structural Design Challenges for an Architecturally Constrained Bridge | Ryan Jenkins, Ph.D., P.E., HDR | |
| IBC 23-17 | Detection of Post-Tension Grout Defects in Bridges | Brian Pailes, Ph.D., P.E., NACE CP Specialist, Vector Corrosion Services | |
| IBC 23-16 | Nondestructive Evaluation of Post Tensioned Ducts of the Eltham Bridge | Shane Boone, Ph.D., Bridge Diagnostics, Inc. | |
| IBC 23-15 | Seismic Strengthening of Bridge Columns with FRP In Lieu Of Steel Jacketing | Clyde Ellis, Structural Technologies | |
| IBC 23-14 | Perquimans River S Bridge Replacement | Timothy Noles, Hardesty & Hanover, LLC | |
| IBC 23-13 | A State-of-the-Art Analysis and Design of a Continuous Seven Spans Post-Tensioned Bridge with Innovative Seismic Isolation Bearings | Sameh Salib, Ph.D., P.Eng., BDS, P.E., WSP Canada | |
| IBC 23-12 | Computational Design of Complex Structures with Faster Finite Element Analysis Programs | Jeff Svatora, P.E., HDR | |
| IBC 23-11 | The Architecture of the new Frederick Douglass Memorial Bridge | James Marks, RIBA RIAS Int’l Assoc. AIA, BEAM Architects | |
| IBC 23-10 | PA Turnpike Bridge Milepost A098.11 (I-476 over Lehigh River) – Tie-Plate Crack Investigation and Emergency Repairs | Bradley Degnan, P.E., TranSystems | |
| IBC 23-09 | Comprehensive Restoration of a Century Old Suspension Bridge (Wurts Street Bridge over the Rondout Creek, Kingston, NY) | Sean Casey, P.E., Modjeski and Masters | |
| IBC 23-08 | Innovative Project Delivery Methods and Technical Solutions on the Emergency Repairs of the Roosevelt Bridge | Eric Sommer, P.E., Structural Technologies | |
| IBC 23-07 | Hidden Lake Bridge Restoration | Andy Lohan, P.E., S.E., | |
| IBC 23-06 | Rehabilitation of a 1930's Steel Crescent Truss Arch | Nicholas Cervo, P.E., HDR | |
| IBC 23-05 | Not Published | Il De Re Testing & Instrumentation | Stephen Schorn, Sixense, Inc. |
| IBC 23-04 | Seismic Isolation for Achieving Functionality of Critical Bridge Structures | Anoop Mokha, S.E., Earthquake Protection Systems | |
| IBC 23-03 | How Geophysics Contributes to Rebuilding the U.S. Infrastructure: A Case Study Involving Seismic Tomography | Siavash Mahvelati, Vibra-Tech Engineers | |
| IBC 23-02 | Use of ASTM A1035-CS Corrosion Resistant and High Strength Reinforcement in the New Nice Middleton Bridge Project for Sustainable Bridge Construction | Hans Geber, Commercial Metals Company | |
| IBC 23-01 | Cast Steel Nodes for Bridge Structures Designed and Built with HSS | Jennifer Anna Pazdon, P.E., CAST CONNEX | |
| IBC 22-87 | Investigation of Ground-Penetrating Radar, Impact Echo, and Infrared Thermography Methods to Detect Defects in Concrete Bridge Decks | Zachary Coleman, Auburn University | |
| IBC 22-86 | Bridge Life Cycle Cost Savings Through Inspectability Design | Jennifer Laning, P.E., TranSystems | |
| IBC 22-85 | Not Published | Retrofits in Twin Tub Girder Bridges for System-level Redundancy | Francisco Javier Bonachera Martin, Ph.D., P.E., Michael Baker International |
| IBC 22-84 | Inspection of the World’s Longest Moveable Span, Ford Island Bridge, Pearl Harbor-Hickam, Hawaii | Amanda Schindhelm, P.E., Marine Solutions | |
| IBC 22-83 | Evaluating Steel Bridge Details for Susceptibility to Constraint-Induced Fracture | Domenic Coletti, P.E., HDR | |
| IBC 22-82 | Evaluation of Cast-In-Place Open Spandrel Concrete Arch Bridges: Four Case Studies | Daniel Baxter, P.E., S.E., Michael Baker International | |
| IBC 22-81 | Replacement of the TRRA Merchants Bridge Truss - Face Lift for a 120 year old bridge | Josh Sakumura Crain, P.E., S.E., Genesis Structures | |
| IBC 22-80 | CSX 59th Street Terminal Bridge Program: Extending the Service Life of an Elevated Terminal | Matthew David Santeford, P.E., S.E., TranSystems | |
| IBC 22-79 | The Importance of a Well-Thought-Out Bridge Management Plan for Individual Bridges | Ashley Grzybowski, P.E., Minnesota DOT | |
| IBC 22-78 | Launching Summit 8 Over Little Cuyahoga River - Analytical Modeling | Lawrence Rolwes, Jr., HNTB | |
| IBC 22-77 | Rehabilitation of Decks in Post-Tensioned Box-Girder Bridges | Philippe Kalmogo, Ph.D., P.E., University of New Hampshire | |
| IBC 22-76 | Using 3D Models to Improve Bridge Design and Deliver Better Projects | Michael Alestra, P.E., Pennoni | |
| IBC 22-75 | Temporary Tower Wind Tongues and Rocker Links for the Benjamin Franklin Bridge | Qi Ye, P.E., CHI Consulting Engineers, LLC | |
| IBC 22-74 | Gantry Cranes Keep Vital Bridge Open During Complete Reconstruction | Murray Johnson, P.Eng., P.E., Stantec | |
| IBC 22-73 | Engineering for Bridge Demolition – The Need for Standardization | Josh Sakumura Crain, P.E., S.E., Genesis Structures | |
| IBC 22-72 | Rapid Partial Bridge Demolition of a Fractured Beam due to a Bridge Strike | Mario LoCoco, HDR | |
| IBC 22-71 | Not Published | Safe Lifting and Handling of Rebar Cages for Deep Foundations | Dylan Allen, P.E., Siefert Associates, LLC |
| IBC 22-70 | Henry Hudson Bridge Rehabilitation | Lucas Morgan, P.E., GCCOM Construction | |
| IBC 22-69 | The West Mission Bay Drive Bridge: Challenges in Achieving Seismic Resistance in a Coastal Environment | Kumar Ghosh, Ph.D., P.E., TYLin | |
| IBC 22-68 | Advancing Foundations: Augered Cast-in-Place Bridge Foundations | Eric Dues, P.E., S.E., Gannett Fleming | |
| IBC 22-67 | Two New Methods for Establishing Simple yet Durable Splicing of Prestressed Concrete Piles | Seyed Saman Khedmatgozar Dolati, Florida International University | |
| IBC 22-66 | Design of the Golden Gate Bridge Main Suspension Span EDDs using Duplex Stainless Steel | Ted Bush, HDR | |
| IBC 22-65 | Stay-In-Place-Fascia-Forms (SIPFF) - a new trend in bridge overhang construction | Gary M. Dinmore, P.E., Dinmore Engineering | |
| IBC 22-64 | Not Published | Zinc Metallic Coatings for Bridge Corrosion Protection: How galvanizing, metalizing and duplex systems have become a game-changer in preserving steel surfaces | Kevin Irving, International Zinc Association |
| IBC 22-63 | Complex Geometry Connects Communities | Andrew Bradshaw, P.E., STV Incorporated | |
| IBC 22-61 | Smart Camber Analysis for close to 1,200 Precast Bridge Frames | Gernot Komar, Dipl.-Ing., Sun Engineering & Technology International, Inc. | |
| IBC 22-60 | Richmond-San Rafael Bridge Gusset Plate Strengthening | Michael Abrahams, P.E., WSP USA | |
| IBC 22-59 | Suspension Span Link Replacement | Dan Millman, P.E., HNTB | |
| IBC 22-58 | The Dublin Link Suspension Bridge Structural Cable System | David Ward, Teufelberger Redaelli Tensostructures | |
| IBC 22-57 | Not Published | Application of Negative Pressure at Exhaust Sleeves and Effects on Air Flow in Main Cables | Jonathan Morey, P.E., WSP USA |
| IBC 22-56 | Cable Inspection and Evaluation, Clinton Gateway Suspension Bridge | Christopher Ligozio, S.E., KPFF Consulting Engineers | |
| IBC 22-55 | Rehabilitation of Arch Skewbacks, Viaduct Piers and Lower Level North Abutment at Henry Hudson Bridge | Chih-Ping Fan, AECOM | |
| IBC 22-54 | Rehabilitation and Retrofit Design of a Historic Steel Truss Bridge in Virginia | Amir Gheitasi, Parsons | |
| IBC 22-53 | The Rehabilitation of Route 1's Wayne Junction Viaduct | Ahcene Larbi, Ph.D., P.E., WSP USA | |
| IBC 22-52 | Innovative Design of the Pulaski Skyway Rocker Bent Rehabilitation | Xin Li, P.E., HNTB | |
| IBC 22-51 | Innovative UHPC Mixing and Placing Techniques for Repair of Three Illinois Bridges | Michael McDonagh, Steelike, Inc. | |
| IBC 22-50 | Post-Tensioning Tendon Repairs of Two Segmental Concrete Bridges | Nick Amico, P.E., HDR | |
| IBC 22-49 | Use of Distributed Strain and Temperature Fiber Optic Monitoring on the West Seattle High Bridge | Thomas Weinmann, BDI | |
| IBC 22-48 | A Twist on Station Footbridge Design | Victoria Richardson, Arup | |
| IBC 22-47 | A Bascule Bridge Within a Bascule Bridge | Patrick Laux, P.E., S.E., WSP USA | |
| IBC 22-46 | Design and Construction of the Robert L.B. Tobin Land Bridge | Matt Carter, Arup | |
| IBC 22-45 | Outside of the Comfort Zone - When the Best Solution Makes a Client Uncomfortable | Jeremy LaHaye, P.E., TYLin | |
| IBC 22-44 | Changeable Wind Conditions Affecting Pedestrian Bridges | Pierre-Olivier Dallaire, RWDI Consulting Engineers & Scientists | |
| IBC 22-43 | Designing the Pittsburgh Airport Terminal Front Bridge | Kevin O'Connor, HDR | |
| IBC 22-42 | Steel Erection for the Margaret McDermott Pedestrian Bridges | Nicola (Nick) Greco, P.E., P.Eng., American Bridge Company | |
| IBC 22-41 | Fully Joint-less Continuous Steel Girder Structure – Update and improvements after 7 years in service | Michael Liona, P.E., Hardesty and Hanover, LLC | |
| IBC 22-40 | Route 6/10 Interchange Reconstruction: Design & Construction of an Urban Interchange using Design/Build | Brian Guzas, P.E., AECOM | |
| IBC 22-39 | Varvsbron: a Unique Cable-Stayed Pedestrian Bridge | Stephen James, BSc DipArch, Stephen James Architects | |
| IBC 22-38 | Not Published | Collapse of the Chirajara Cable Stayed Bridge in Colombia | Thomas Murphy, Ph.D., P.E., S.E., Modjeski and Masters, Inc. |
| IBC 22-37 | Not Published | A record breaking prestressed concrete extradosed bridge | Marcos Sánchez, Arup |
| IBC 22-36 | Replacement of the Kosciuszko Bridge over Newtown Creek Phase 2 - Construction and Erection Engineering | Preston Vineyard, COWI | |
| IBC 22-35 | Gordie Howe International Bridge: Project Overview and Design Features | Barry Chung, AECOM | |
| IBC 22-34 | Rehabilitation of I-95 using the CM/GC Delivery Method | William Geschrei, Whitman, Requardt & Associates, LLP | |
| IBC 22-33 | Hurricane Ida Emergency Repairs at a Bridge Wall Washout | Melissa Dawson, P.E., WSP USA | |
| IBC 22-32 | Optimizing Bridge Design and Construction through Collaboration | Kumar Ghosh, Ph.D., P.E., TYLin | |
| IBC 22-31 | CMAR Delivery of I-15 Virgin River Bridge No. 1 – Longest Steel Girder Span in Arizona | Jason Nauman, P.E., HDR | |
| IBC 22-30 | Exploring Fiber-Reinforced Polymer Concrete for Accelerated Bridge Construction Applications | Carolyn Donohoe, University of Washington | |
| IBC 22-29 | Prefabricated Bridge Decks – Speed and Durability | Lawrence Rolwes, Jr., HNTB | |
| IBC 22-28 | Superstructure Modules at Bridges 3-155 N&S over Broadkill River, Sussex County, DE | Fred Ophardt, P.E., Whitman, Requardt & Associates, LLP | |
| IBC 22-27 | Not Published | Reclassifying Fracture Critical Members to System Redundant Members in a steel Arch Bridge | Ardalan Mosavi, Arup |
| IBC 22-26 | Caltrans Load Rating of Complex Curved Steel Girder Bridges | Michael Kochly, P.E., HDR | |
| IBC 22-25 | 83 Days – The Hernando De Soto Bridge Repair | Richard Schoedel, P.E., Michael Baker International | |
| IBC 22-24 | Health and Protection of Cable Stayed Bridges | Robert Sward, P.E., Structural Technologies | |
| IBC 22-23 | Not Published | Construction and Live Load Behavior of a Skewed Steel I-Girder Bridge | Siang Zhou, University of Illinois Urbana-Champaign |
| IBC 22-22 | Diagnostic Load Testing of Ten Bridge-Class Culverts | James Werosta, WSP USA | |
| IBC 22-21 | Fatigue Testing in Negative Moment Region of a Continuous Stringer Bridge | "Leon" Lung-Yang Lai, P.E., S.E., Specialty Engineering, Inc. | |
| IBC 22-20 | 3GW1 Elevated Guideway Triangular Bridge for the Los Angeles World Automated People Mover | Ted Bush, HDR | |
| IBC 22-19 | Bridge Aesthetics for Short Span Bridges Reflecting the Community: Case Studies for Two Aesthetic Driven Bridges | Jesse Kadekawa Miguel, AIA, NCARB, ENV, SP, HNTB | |
| IBC 22-18 | Not Published | Closure Pour Innovations in Long-Span Concrete Bridges | Brad Mielke, P.E., S.E., Michael Baker International |
| IBC 22-17 | Bootstrapping Opportunities for Design in an Risk Led Context | Emily Perchlik AIA, LEED AP, VIA Architecture | |
| IBC 22-16 | Separation of a Post-Tensioned Box Beam Bridge | Mario LoCoco, HDR | |
| IBC 22-15 | Expanding the Metro System in Montreal, Viaducts and Bridges of Réseau Express Métropolitan (REM) | Firooz Panah, AECOM | |
| IBC 22-14 | I-20 Value Engineering Study and Final Design | Natalie McCombs, P.E., S.E., HNTB | |
| IBC 22-13 | Innovation, Teamwork and a 4 Day Closure – Bunker Creek Bridge | Adam Stockin, WSP USA Inc. | |
| IBC 22-12 | Using ABC Techniques and Innovative Design Details to Overcome Site Access Challenges | Lawrence Kirchner, P.E., S.E., TranSystems | |
| IBC 22-11 | Doing ABC in Massachusetts. The Acceler-8 I-90 Bridge Replacements Project | Robert Elliott Jr., P.E., CDR Maguire | |
| IBC 22-10 | BNSF Railroad over the Central Tri-State Tollway (I-294) | Demico Cole, TranSystems | |
| IBC 22-09 | Accelerated Bridge Construction for the Long Island Railroad Mainline Expansion Project | Pak So, P.E., Stantec | |
| IBC 22-08 | De Roche Creek Lateral Bridge Slide – Easing Traffic Disruption & Improving Safety | John Zuleger, P.E., SPRAT 3, Michael Baker International | |
| IBC 22-07 | The OCCI Bridge Builder | David Rogowski, Genesis Structures, Inc. | |
| IBC 22-06 | Structural Health Monitoring of the Canakkale Bridge in Turkey, the Largest Monitoring System for the Longer Bridge in the World | Stéphane Joye, Sixense | |
| IBC 22-05 | Bridge Rehabilitation with Ultra-High Performance Concrete Bridge Overlays | Peter Seibert, P.Eng., UHPC Solutions North America | |
| IBC 22-04 | Japan’s Proven Solution to Prevent Unseating of Bridges During a Seismic Event | Hideto Kida, Dr. Eng., P.E., SHO-BOND Corporation | |
| IBC 22-03 | Cast-In-Place ABC Solution - The InQuik Bridge System Technical and Projects Presentation | Logan Mullaney, InQuik Pty Ltd. | |
| IBC 22-02 | The Smart Hybrid Bridge - Time to Innovate in Bridge Management Policy and Practice | Brian Westcott, Ph.D., Intelligent Structures, Inc. | |
| IBC 22-01 | UHPC Repair of Steel Columns in the Walnut Tunnel in Philadelphia | Michael McDonagh, P.E., P.Eng., Steelike, Inc. | |
| IBC 21-79 | Design-oriented Geostatistical Calculation of Pile and Shaft Axial Capacities | Michael Davidson, Ph.D., P.E. , University of Florida | |
| IBC 21-78 | Substantial Downdrag Requires a Micro Solution | Craig Klusman , AECOM | |
| IBC 21-77 | An Innovative and Robust Sinkhole Repair for PennDOT | Thomas Leckrone, P.E., C.B.S.I., P.M.P. , Gannett Fleming, Inc. | |
| IBC 21-76 | Use of Spliced Girders for Long-Spans Crossing Environmentally Sensitive Areas | Sami Megally , Kleinfelder | |
| IBC 21-75 | The Kâhasinîskâk Pedestrian Bridge in Edmonton: Parametric design for user comfort | Pierre-Louis Cons, P.Eng. , Arup Canada Inc. | |
| IBC 21-74 | Design & Construction of the Lilac Pedestrian Bridge | Robert Durfee , DuBois & King, Inc. | |
| IBC 21-72 | Not Published | ALL EYES ON THE ICON: Navigating the Type Selection Process of the I Street Lift Bridge | Noel Shamble , T.Y. Lin International |
| IBC 21-71 | Not Published | Structure Health Monitoring and Dynamic Response of Two More than Century Old Truss Railroad Bridges | Celso de Oliveira , University of Connecticut |
| IBC 21-70 | Not Published | Rope Tensioning, Span Balancing, Gear Indexing, and Seating Corrections of 3 Vertical Lift Bridges | Robert Algazi , WSP USA |
| IBC 21-69 | Remote Radar Monitoring for Bridge Load Testing and Stay Cable Forces | Larry Olson , Olson Engineering, Inc. | |
| IBC 21-68 | Validation of Fiber Reinforced Concrete Performance in Laboratory and Field for Bridge Rehabilitation | Kuang-Yuan Hou , The Bridge Engineering Software & Technology Center, Department of Civil and Environmental Engineering, University of Maryland | |
| IBC 21-67 | Not Published | An LRFR Approach for Classifying Military Vehicles for U.S. Army-Owned Bridges that Require Engineering Judgement | Monica McCluskey, P.E. , PRIME AE Group |
| IBC 21-66 | Proof Load Testing of Prestressed Concrete Adjacent-Beam Bridges | Mark Guzda , AECOM | |
| IBC 21-65 | Supporting Bridge Inspectors with Interactive Mixed Reality Visualizations of BIM Process and Geometry Data | Urs Riedlinger , Fraunhofer Institute for Applied Information Technology FIT | |
| IBC 21-64 | UAS Recommendations for PennDOT Bridge Inspections | Alicia McConnell , Michael Baker International | |
| IBC 21-63 | Kentucky Transportation Cabinet - UAS for Bridge Inspection and Major Bridge Emergency Response | Tracy Nowaczyk, P.E. , Kentucky Transportation Cabinet | |
| IBC 21-62 | Sellersville Truss Rehabilitation: A Bridge Worth Saving | Brian Watson, P.E. , HDR | |
| IBC 21-61 | Repurposed Bridge Rehabilitation: Converting HOV Lanes to Toll Lanes 395 Express Lanes | Roberto Vilanova , AECOM | |
| IBC 21-60 | Rehabilitation of the Rockville Truss | Brian Byrne , Lochner | |
| IBC 21-59 | Not Published | Study of Vehicular Impact on Reinforced Concrete Bridge Parapet for Design | Bao Chuong, P.E. , Connecticut DOT |
| IBC 21-58 | TRB Journal | Evaluation and Load Rating of a Steel Girder In-Span Hinge Connection | Sofia Puerto, Ph.D., P.E. , Michael Baker International |
| IBC 21-57 | Design and Construction of Four UHPC Bridge Deck Overlays for NJDOT | Steve Esposito, P.E., PMP , WSP USA | |
| IBC 21-56 | Construction Engineering using Bridge Integrated Modeling on the 3rd Avenue Bridge Rehabilitation Project | Ivan Liu, P.E. , FINLEY Engineering Group | |
| IBC 21-55 | The Graceful Beauty of the Parabolic Box Girder in Bridge Construction & other Structures | Robert Cisneros , High Steel Structures LLC | |
| IBC 21-54 | Advancing Rail System - The Assembly Line for Building the Rodanthe Jug-Handle Bridge | JJ Reilly , McNary Bergeron & Associates | |
| IBC 21-53 | 7 Mile Bridge Innovative High Capacity Friction Collars | George Patton, P.E. , Hardesty & Hanover, LLC | |
| IBC 21-52 | From Breaking Ground to Ribbon Cutting - Constructing the Frederick Douglass Memorial Bridge | JJ Reilly , McNary Bergeron & Associates | |
| IBC 21-51 | Construction and Constructability of the I-74 Mississippi River Arches | Erich Heymann , McNary Bergeron and Associates | |
| IBC 21-50 | Part II: Strategies in the Cost-Effective Design of the New Harry W. Nice / Thomas “Mac” Middleton Bridge | Stephen Matty, P.E. , AECOM | |
| IBC 21-49 | Part I: Strategies in the Procurement, Design and Construction of the New Harry W. Nice / Thomas “Mac” Middleton Bridge | Kenneth Butler, P.E. , AECOM | |
| IBC 21-48 | Emergency Reconstruction of the Moravia Road Ramp to I-95 Southbound | Scott Reynolds, P.E. , Hardesty & Hanover, LLC | |
| IBC 21-47 | A Novel Method of Project Delivery for the Kingston Third Crossing | Zachary McGain , International Bridge Technologies | |
| IBC 21-46 | Alternative Technical Concept (ATC) and Aesthetic Project Technical Enhancement (APTE) of the I-395/SR 836/I-95 Project in Florida | William Detwiler, P.E. , T.Y. Lin International | |
| IBC 21-45 | Public-Private Partnership (P3) Procurement Method and Design-Build Delivery for the Samuel De Champlain Bridge | Guy Mailhot, Eng. M.Eng., FSCE, FEIC , Infrastructure Canada | |
| IBC 21-44 | TRB Journal | Alternative System and Materials for Splicing Prestressed-Precast Concrete Pile | Seyed Saman Khedmatgozar Dolati , Florida international University |
| IBC 21-43 | River Road Bridge over Raritan Valley RR, Emergency Bridge Replacement | Steve Esposito, P.E., PMP , WSP USA | |
| IBC 21-42 | Not Published | Accelerated Bridge Construction Techniques for the Rehabilitation of the Anacostia Freeway Bridges over Nicholson Street, SE, Washington D.C. | Ruel Manuel , PRIME AE Group, Inc. |
| IBC 21-41 | Not Published | SPMT Demolition of the West River Bridge | Michael Oliver , STV Incorporated |
| IBC 21-40 | Idaho Bridge Slides 2.0 | Brian Byrne , Lochner | |
| IBC 21-39 | Not Published | Steel Bridge Design Innovations for the New US27/S25/Okeechobee Rd. and SR826/Palmetto Expressway Interchange | Patrick Noble, P.E., S.E. , FINLEY Engineering Group |
| IBC 21-38 | Evaluation, Instrumentation & Retrofit of the Distortion-Induced Fatigue Cracking in the I-95/I-395 Steel Box Girder Bridges | Christopher Smith, P.E. , Modjeski and Masters, Inc. | |
| IBC 21-37 | Emergency Repair of I-895 over Frankfurst Ave. by Cut Out and Replace | Marcus Gursky, P.E. , Whitney Bailey Cox & Magnani, LLC | |
| IBC 21-36 | Not Published | Rocker Link Replacement Quality Controls | Jonathan Morey , WSP USA |
| IBC 21-35 | The First Ultra High Performance Concrete (UHPC) Bridge Deck Overlay on a Major Suspension Bridge in the United States | Shekhar Scindia , Deleware River and Bay Authority | |
| IBC 21-34 | Transfer of Loading from Existing Main Cable to Supplemental Cables | Jonathan Morey , WSP USA | |
| IBC 21-33 | Brent Spence Bridge Fire and Rehabilitation | Jason Stith, Ph.D., P.E., S.E. , Michael Baker International | |
| IBC 21-32 | Analysis of Steel Composite Bridges Exposed to LRT Fire – A Performance-Based Design | Aguiade Drak El Sebai, P.E. , AECOM | |
| IBC 21-31 | Important Changes in the 2020 RCSC Specification for Structural Joints Using High-Strength Bolts | Jeff Greene , LeJeune Bolt Company | |
| IBC 21-30 | Using 3D Models to Improve Bridge Design and Deliver Better Projects | Michael Alestra, P.E. , Pennoni Associates Inc. | |
| IBC 21-29 | TRB Journal | Instrumentation Results of New MASH Crash Tested Barriers for William P. Lane, Jr. Bridge | Travis Hopper, P.E. , Modjeski and Masters |
| IBC 21-28 | Using Innovative Design to Meet the Needs of Stakeholders | George Tawfik , STV | |
| IBC 21-27 | Not Published | BIM for Bridges and Structures Case Study: Outcomes and Lessons Learned from the Steel Bridge Industry | Aaron Costin, Ph.D. , University of Florida |
| IBC 21-26 | Jointless Accelerated Bridge Construction in Seismic Regions | Bijan Khaleghi , Washington State DOT | |
| IBC 21-24 | Longfellow Bridge Rapid Construction | William Goulet, S.E. , STV Incorporated | |
| IBC 21-23 | Replacement of the BNSF Truss 66.4 – A Multi-Level Approach to Accelerated Bridge Construction - Fabrication to Roll-On to Float-In | Joe Knapp , Genesis Structures | |
| IBC 21-22 | Design and Construction of the Fulton Bridges | Matthew Bunner, P.E. , HDR | |
| IBC 21-21 | Design and Construction of Prefabricated Bridge Elements for the Replacement of Bridges 1-676 and 1-677 | Nicholas Dean, P.E., M.C.E. , Delaware DOT | |
| IBC 21-20 | Saving the Bridge – The Long Term Solution to Mitigate Aggressive Pile Corrosion | Donald Green, P.E. , Michael Baker International, Inc. | |
| IBC 21-19 | TRB Journal | Finite Element Analysis and Long-term Monitoring of a Highway Overpass Bridge with Newly Constructed Link Slabs and Modified Bearings | Yifan Zhu , The Bridge Engineering Software and Technology (BEST) Center, University of Maryland |
| IBC 21-18 | Innovative Design Applications: 31st Street NW Bridge over C&O Canal, Washington, DC | Bradford Shaffer , AECOM | |
| IBC 21-17 | Preservation of an Open Spandrel Historic Arch Bridge and an ASR Affected Bridge in North Carolina | John Sloan , AECOM | |
| IBC 21-16 | Bridge Digital Twin: A Paradigm Shift in Digital Preservation of Bridges against Overweight Damages | Aaron Costin, Ph.D. , University of Florida | |
| IBC 21-15 | Rehabilitation and Replacement of 26 Bridges along I-70 | Michael Perry, P.E. , Stantec | |
| IBC 21-14 | Partial Steel Girder Replacement Due to Repeated Impact Damage and Use of Instrumentation to Monitor Effectiveness of Repair | Laura Magoon, P.E. , RK&K | |
| IBC 21-13 | TRB Journal | Safe Platooning Headways on Girder Bridges | Joshua Steelman , University of Nebraska-Lincoln, Ph.D., P.E. |
| IBC 21-12 | Horizontally Curved Steel Bridge Girder with Rectangular Tube Top Flange | Geoffrey Stryker , STV Incorporated | |
| IBC 21-11 | Design & Construction of the GCRTA Blue Green Line Bridges | Christopher Cummings, P.E., DBIA , Michael Baker International | |
| IBC 21-10 | TRB Journal | Influence of Material Toughness on Fracture Reliability in Steel Bridges | Frank Artmont , Modjeski and Masters |
| IBC 21-09 | Planning and Design of the I-294 Mile Long Bridge | Lance Peterman, Jr., P.E., S.E. , HDR | |
| IBC 21-08 | Bridge Resiliency and Post-Earthquake Functionality Requirements | Bijan Khaleghi , Washington State DOT | |
| IBC 21-07 | Seismic Design of the Gerald Desmond Bridge | Javier Campos , Arup | |
| IBC 21-06 | Not Published | Chacao Bridge: Testing of Key Bridge Components to Ensure Effective Life-Cycle Performance | Carlos Mendez-Galindo, Ph.D. , mageba Latin America |
| IBC 21-04 | Cathodic Protection of Arlington Memorial Bridge with Two-Stage Anodes | Natallia Shanahan , Vector Corrosion Services | |
| IBC 21-03 | Lessons Learned from Using UAVs for Bridge Inspection on the Latah High Bridge in Spokane, WA | Nathan Schuett , PRENAV | |
| IBC 21-02 | High Load Multirotational Bearings for the Laguardia Airport Modernization Project | Ron Watson , R. J. Watson, Inc. | |
| IBC 21-01 | Innovative Bridge Rehabilitation using Pultruded FRP Decking | Ali Mohammed , Wagners CFT | |
| IBC 21-Reserve Zhou | Initial Field Response and Modeling of Two Skewed Steel I-Girder Bridges | Siang Zhou, University of Illinois | |
| IBC 21-Reserve Mertes | Tunnel Fire Durability, Ventilation Analysis and Development of the NTIS Tunnel Inspection and Load Rating Manual | Rama Krishnagiri, WSP | |
| IBC 20-81 | US 54 Canadian River Cast-in-Place Segmental Bridge | Jeff Mehle, McNary Bergeron & Associates | |
| IBC 20-80 | Rapid Construction of a Precast Segmental Bridge Using the Span-by-span Method | Harry McElroy, P.E., M.S., McNary Bergeron and Associates | |
| IBC 20-79 | Stites Tunnel: Replacing the Bridge Inside a Tunnel | Quentin Rissler, P.E., Larson Design Group | |
| IBC 20-78 | High Load Jacking Frames for Pin and Hanger Replacement at the Robert Moses Causeway | Qi Ye, P.E., CHI Consulting Engineers, LLC | |
| IBC 20-76 | Emergency Response to Route NJ 139WB Fire | Gregory Stolowski, P.E., WSP USA | |
| IBC 20-75 | Using ABC Techniques Under Phased Construction | Thomas Anthony, P.E., CBSI, The Markosky Engineering Group | |
| IBC 20-74 | Using ABC to Widen America’s Longest Bridge – What’s Old is New | Christopher White, Volkert, Inc. | |
| IBC 20-72 | Not Published | Temporary Bridge Slide Accelerates Interstate Construction in Minnesota | Joe Campbell, P.E., M.S.C.E., FHWA - Minnesota Division |
| IBC 20-71 | Underwater Rehabilitation of the SR 141 (Newport Viaduct) Piers 2 and 3 Foundations | John Ward IV, AECOM | |
| IBC 20-70 | Electrochemical Chloride Extraction for Substructure Preservation - Milltown Road over US-1 | Melissa Mertes, WSP USA | |
| IBC 20-69 | Directionality of Soil Resistance for Design-Oriented Lateral Load Analysis of Bridge Piers | Michael Davidson, University of Florida | |
| IBC 20-68 | Execution of a Large-Scale Design-Phase Pile Test Program for the I-480 Valley View Bridge | Benjamin White, GRL Engineers, Inc. | |
| IBC 20-67 | Route 29/195 EB Ramp to Route 295 SB Emergency Repair | George Zimmer, WSP USA | |
| IBC 20-66 | A Simplified Calculation Method of Flexural Strength Calculation for CFST Composite Truss Bridge | Yinping Ma, Chang'an University | |
| IBC 20-64 | Development of Design Charts for Transverse Vertical Shear in Shear-Connected Precast Concrete Box Beam Bridges Subjected to AASHTO Truck Loading | Hosam Sennah, Ryerson University | |
| IBC 20-63 | Innovative Design Techniques and Materials Benefit the New High Rise Bridge over Southern Branch of the Elizabeth River | Gregory Shafer, Parsons | |
| IBC 20-61 | Design and Construction of the SR 22 Bridge Replacements | David Klyce, P.E., RK&K | |
| IBC 20-60 | TRB Journal | Press Brake Formed Tub Girders Prove Successful in Project with Challenging Site Constraints | Karl Barth, Ph.D., West Virginia University |
| IBC 20-59 | A Gathering Place for Tulsa - Taking The Midland Valley Trail Across Riverside Drive | Gregor Wollmann, P.E., HNTB | |
| IBC 20-58 | Mon Wharf Switchback Pedestrian Bridge | Jason DeFlitch, P.E., SAI Consulting Engineers, Inc. | |
| IBC 20-57 | Not Published | Two Girder System Redundancy Design Glen Road Pedestrian Bridge | Paulina Arczewska, Ph.D., P.Eng., Morrison Hershfield |
| IBC 20-55 | New Pedestrian Cable-Stayed Bridge at University of Memphis | Roger Haight, P.E., ENV SP, WSP USA | |
| IBC 20-54 | Atwater Village Cable Stayed Equestrian Bridge | Dan Fitzwilliam, T.Y. Lin International | |
| IBC 20-53 | Walk Through the Eye of a Needle | Dan Fitzwilliam, T.Y. Lin International | |
| IBC 20-52 | Adding a Lane to the Historic Pulaski Skyway - Design and Construction of Large Floorbeam Cantilevers | Daniel Zaleski, P.E., WSP USA | |
| IBC 20-51 | Steel Truss Gusset Load Rating | David Konz, P.E., S.E., Atkins | |
| IBC 20-50 | Structural Testing and Monitoring of the I-15 Virgin River Bridges | Travis Butz, Burgess and Niple | |
| IBC 20-49 | Deck Slab Closure Effects on Bridge Behavior: James River Bridge Case | Sherif Daghash, Ph.D., P.E., Michael Baker International | |
| IBC 20-47 | In-depth Inspection, Refined Analysis and Retrofit of Two Skewed Steel Bridges with Distortion-Induced Fatigue Cracking | Jordan Coleman, EIT, WSP USA | |
| IBC 20-46 | Diagnosis and Repair of Deficiencies in Ohio Post-Tensioned Bridges | Travis Butz, P.E., Burgess and Niple | |
| IBC 20-45 | Construction of the Gilman Arch Bridge at UC San Diego | Anthony Sanchez, P.E., Sytra IBT | |
| IBC 20-44 | The New Champ Clark Bridge: Using Design-Build to Span the Mississippi River | Mike Briggs, P.E., S.E., HNTB Corporation | |
| IBC 20-43 | Temporary Jacking Frame and Hanger for Delaware Memorial Bridges | Qi Ye, P.E., CHI Consulting Enigneers, LLC | |
| IBC 20-41 | Design and Erection of Structural Steel for the I-480 Valley View Bridge | Noah Holladay, Walsh Construction Company II, LLC | |
| IBC 20-38 | Construction of the Tawatina LRT Bridge | Jerry Pfuntner, P.E., S.E., P.Eng., FINLEY Engineering Group | |
| IBC 20-36 | Design of the Gordie Howe Bridge | Steven Stroh, Ph.D., P.E., S.E., P.Eng., AECOM | |
| IBC 20-35 | Two Become One: Advanced Analysis and Design for Adjacent Precast Tub Girders for High Speed Rail | Chris Knipp, P.E., Jacobs | |
| IBC 20-33 | Rail-Structure Interaction and Track Serviceability Analysis of High Speed Rail Bridges | Sarwar Naveed, P.E., S.E., RailPros | |
| IBC 20-32 | Accelerated Replacement of the CSX Bayou Sara Swing Span Bridge | Kevin Kane, P.E., Brasfield & Gorrie, LLC | |
| IBC 20-31 | Float-Out and Float-In of BNSF Wind River Truss | Joe Knapp, Genesis Structures | |
| IBC 20-30 | Upgrading a Tunnel for the 21st Century | Martha Averso, P.E., Gannett Fleming, Inc. | |
| IBC 20-29 | Investing in Safety – Designing for AASHTO Guide Specifications for Vessel Collision of Highway Bridges with Sustainable Materials | Sam Boukaram, WSP USA | |
| IBC 20-28 | Not Published | Dehumidifying and Preserving the Main Cables of the Historic Anthony Wayne Bridge | Joshua Pudleiner, AECOM |
| IBC 20-27 | The Rehabilitation of the Historic Penn Street Bridge | Grant Flothmeier, P.E., Gannett Fleming, Inc. | |
| IBC 20-26 | Use of Carbon Fiber Composite Wrap and External Post-tensioning to Strengthen Prestressed Concrete I- beams in the Hampton Roads Bridge Tunnel Approach Spans | Michael Sprinkel, P.E., Virginia DOT | |
| IBC 20-25 | Development of the Rehabilitation Program for the Historic 3rd Avenue Bridge – A CM/CG Approach | Keith Molnau, P.E., Minnesota DOT | |
| IBC 20-24 | Design Challenges of a Unique Conventional Highway Bridge that Swings | Jack Ajrab, M.Sc., P.Eng., Parsons | |
| IBC 20-23 | From Quincy to Haiti, Salvaging a Bridge for Charity over the Riviere Cochon Gras | Brian Brenner, Tighe & Bond | |
| IBC 20-22 | Retrofit of a Rolling Leaf Bascule Bridge | Gregory Black, P.E., AECOM | |
| IBC 20-20 | Rt 7 Wittpenn Bridge over the Hackesack Design and Construction | Leonardo Giraldo, Jacobs | |
| IBC 20-19 | Metro North Movable Bridge Inspections and Evaluations | Muhammad Ammad, TranSystems | |
| IBC 20-18 | Rehabilitation and Widening of the Historic I-78 Mainline Spandrel Arch Bridge | Carol Choi, T.Y. Lin International | |
| IBC 20-17 | Emergency Response and Repair of State Route 6 Bridge over French Creek following Over-Height Vehicle Strike | Frank Artmont, Ph.D., P.E., Modjeski and Masters | |
| IBC 20-16 | Low-Frequency Sinusoidal Web Girders Using Conventional Fabrication Techniques | Peter Wang, Ph.D., Princeton University | |
| IBC 20-15 | A Spliced Girder Bridge for the Wilmington Waterfront | Joshua Kahan, P.E., Rummel, Klepper, & Kahl | |
| IBC 20-14 | The 2.4-Mile Long Rodanthe Bridge in North Carolina | Satrajit Das, Ph.D., P.E., RK&K | |
| IBC 20-13 | Not Published | FHWA Bridge Welding Reference Manual | Ronnie Medlock, High Steel Structures LLC |
| IBC 20-11 | Long-Lasting Project History Spurs Rapid Replacement of US Route 1 Over I-95 in Stamford, Connecticut | George Gerard V, P.E., WSP USA | |
| IBC 20-10 | Replacement of the Shaler Street Bridge Using Self-Propelled Modular Transporters | Matthew Cochran, P.E., Lochner | |
| IBC 20-09 | Wellsburg Bridge - Construction Methods and Float In | Charbel Raad, McNary Bergeron & Associates | |
| IBC 20-08 | EB Wilson Boulevard Bridge over Route 50: ABC Weekend Superstructure Replacement | Kelly Guild, P.E., WSP USA | |
| IBC 20-04 | Monitoring of First Circular (reusable) Bridge | Chris Fielding, DYWIDAG | |
| IBC 20-03 | Weekend Deck Replacements of Four Interstate Bridges Utilizing a Simple Precast Deck System | John Gonyea, Fort Miller | |
| IBC 20-02 | Landslide Mitigation for Bridge Piers on Unstable Slope with Rows of Pressed-in Pipe Piles | Takefumi Takuma, Giken Ltd. | |
| IBC 20-01 | Substructure Rehabilitation using Galvanic Encasement of the Frederick G Gardiner Expressway | Rachel Stiffler, Vector Corrosion | |
| IBC 19-80 | Design and Construction of the 2nd Street Bridge - Austin, Texas | Robert Anderson, P.E., S.E., AECOM | |
| IBC 19-79 | Pedestrian Bridges and Walkways – Controlling Vibration Through Tuned Mass Damper Design | Pierre-Oliver Dallaire, M.A.SC., ING, RWDI | |
| IBC 19-78 | Heavy Haul Adjacent Bulb Tee Bridge | Aaron Craig, P.E., P. Joseph Lehman, Inc. | |
| IBC 19-77 | Dynamic Analysis Evaluating Human Induced Vibrations in a Lightweight Suspension Bridge | Martin Hudecek, Ph.D., E.I.T., Stantec Consulting Ltd. | |
| IBC 19-76 | A Refined Analysis Method for Load Rating a Spandrel Arch Bridge | Khatereh Vaghefi, Ph.D., P.E., WSP USA | |
| IBC 19-75 | Inspection of the Glen Canyon Dam Access Tunnel in Page, Arizona | Steve Brandon, P.E., P.G., Schnabel Engineering Inc. | |
| IBC 19-74 | Seeing beyond the Surface - Underwater Visualization using 3D Sonar | Nicole Bartelt, P.E., Minnesota DOT | |
| IBC 19-73 | A New View for Bridge Inspectors | Joe Campbell, P.E., M.S.C.E, FHWA - MN | |
| IBC 19-72 | Preliminary Analytical Study of Live Load Effect on Seismic Responses of Simply Supported Bridge | Cunyu Cui, Tongji University | |
| IBC 19-71 | Seismic Design of Integral Abutment Bridge | Mohamed Zawam, WSP Canada Inc. | |
| IBC 19-70 | Repair of CFST Bridge Columns Subjected to Seismic Loading | Max Stephens, University of Auckland | |
| IBC 19-69 | Novel Approach towards Improving the Seismic Response of Irregular Bridges: Tuned Structures | Max Stephens, University of Auckland | |
| IBC 19-68 | Village Covered Bridge (Friendship Bridge) Adaptive Reuse | James Hall, Jr., P.E., Dubois & King, Inc. | |
| IBC 19-67 | Frances Appleton Pedestrian Bridge Design and Construction | Miguel Rosales, AIA, Rosales + Partners | |
| IBC 19-66 | Bringing the Past to Life: Historic Glendale Bridge Restored and Repurposed | Anthony Steffee, P.E., Mead & Hunt, Inc. | |
| IBC 19-65 | Poplar Street Bridge Slide | Gregory Kuntz, P.E., HDR | |
| IBC 19-64 | Bridge Foundations: Constructability Considerations in the Design and Selection Process | Steve Fung, P.E., Schnabel Engineering | |
| IBC 19-63 | Implementation for Design of Bridges to Resist Dynamic Barge Impact Loads | Michael Davidson, Ph.D., P.E., University of Florida | |
| IBC 19-62 | Low-Cycle Fatigue Cracking of DelDOT BR 1-501: A Case Study | James Bellenoit, P.E., AECOM | |
| IBC 19-61 | Behavior of Eyebars on a 110-year Old Truss Railroad Bridge | David Jacobs, P.E., F.ASCE, University of Connecticut | |
| IBC 19-60 | Myrtle Avenue Bridge: The Accelerated Replacement of the New York City Transit Bridge | Arjuna Ranasinghe, Ph.D., P.E., SE, PP, Jacobs Engineering | |
| IBC 19-59 | Design of a Concrete Tied-Arch Bridge for California High-Speed Rail Requirements: Use of Vertical Hangers vs Inclined Hangers | Ebadollah Honarvar, Ph.D., P.E., Jacobs | |
| IBC 19-58 | Study of Rail Break Gap on Bridges: Finite Element Analysis, Modification of Gap Formula and Parametric Investigation | Hamid Omran, Ph.D., P.Eng., Stantec | |
| IBC 19-57 | Design of Ihsaniye Viaduct of Northern Marmara Motorway | Julien Erdogan, Freyssinet | |
| IBC 19-56 | Design and Construction of a Modern Concrete Segmental Bridge | John Dvorak, P.E., CBI, Figg Bridge Engineers, Inc. | |
| IBC 19-55 | Landmark Extradose Bridge on the Ganges River | Morgan Trowland, P.Eng., McElhanney Consulting Services | |
| IBC 19-54 | Design and Erection Analysis of the New Frederick Douglass Memorial Bridge | Nathan M. Porter, P.E., AECOM | |
| IBC 19-53 | Creation of an Elegant and Iconic New Frederick Douglass Memorial Bridge | Kenneth V. Butler, P.E., AECOM | |
| IBC 19-52 | Innovative Construction Means and Methods for the New Samuel De Champlain Bridge | Jeff Rogerson, P.Eng., Flat Iron Corp. | |
| IBC 19-51 | Technical Challenges in Design of the Approach Viaducts of the New Samuel De Champlain Bridge | Zachary McGain, P.Eng., P.E., Systra International Bridge Technologies | |
| IBC 19-50 | Design of the Cable-Stayed Bridge Signature Span of the New Samuel De Champlain Bridge | Marwan Nader, Ph.D., P.E., T.Y. Lin International | |
| IBC 19-49 | The New Samuel De Champlain Bridge – Performance and Design Criteria | Marwan Nader, Ph.D., P.E., T.Y. Lin International | |
| IBC 19-48 | Owner Objectives and Delivery Method for the New Samuel De Champlain Bridge Corridor Project | Guy Mailhot, P.Eng., M.Eng., Infrastructure Canada | |
| IBC 19-47 | Reduced Partial Factors for Load Assessment in UK Assessment Standards | Chris Hendy, FREng, MA CEng FICE Eur Ing, Atkins SNC-Lavalin | |
| IBC 19-46 | 3D Simulation Testing of Resistance Barrier Gates | Rama Krishnagiri, WSP | |
| IBC 19-45 | Detailing for Precast Elements Under High Seismicity in the Sound Transit Northgate Link Extension | Justin Clark, P.E., WSP | |
| IBC 19-44 | Advantages of Permanent Top Strands in Precast/Prestressed Concrete Bridge Girders | Richard Pickings, MS, P.E., BridgeSight Inc. | |
| IBC 19-43 | Evolution of Bolt and Rivet Shear Strength in Steel Structures | Raymond Tide, D.Sc., S.E., Wiss, Janney, Elstner Associates, Inc. | |
| IBC 19-42 | Replacing a Historic Welded Steel Rigid Frame Bridge | Rebekah Gaudreau, P.E., WSP USA | |
| IBC 19-41 | Virginia Adjacent Member Connections for Prestressed Concrete Boxbeams and Slabs | Junyi Meng, Ph.D., P.E., Virginia DOT | |
| IBC 19-40 | IBC 19-40: Multiaxial Fatigue Life Assessment of a Vertical-Lift Bridge Connection using Strain Rosette Data | Sofia Puerto Tchemodanova, Tufts University | |
| IBC 19-39 | Jacques Cartier Bridge – Challenges in Wind Rehabilitation Work of an Old Steel Truss Bridge | Stoyan Stoyanoff, Ph.D., P.Eng., ing., RWDI | |
| IBC 19-38 | Retrofitting the Burlington-Bristol Bridge | Danielle Schroeder, EIT, Pennoni | |
| IBC 19-37 | Design and Construction of Blenheim Covered Bridge | Sean James, P.E., Hoyle, Tanner & Associates, Inc. | |
| IBC 19-36 | Adams Avenue Historic Arch Structure Rehabilitation | Christopher Bentz, P.E., Alfred Benesch and Company | |
| IBC 19-35 | Lightweight Superstructure Replacement of the Bridge Carrying Baltimore Harbor Tunnel Thruway Over Patapsco River Flats | Shilpa Kodkani, P.E., Rummel Klepper and Kahl | |
| IBC 19-34 | Rehabilitation of an Historic Phoenix Column Truss Bridge Due to Vehicular Collision | John Baumgardner, P.E., HDR | |
| IBC 19-33 | Suspender Cable Inspection Using Advanced Robotic Technology at Arrigoni Bridge | Muhammad Asif Iqbal, P.E., LEED Green Associate, AI Engineers, Inc. | |
| IBC 19-32 | Design & Construction of the Shimla Cable Stayed Bridge | Lucas Wise, CPEng., Systra - International Bridge Technologies | |
| IBC 19-31 | A Beacon of Coastal Beauty – Inspired by Community Vision | William Johnson, IV, P.E., SE, Figg Bridge Engineers, Inc. | |
| IBC 19-29 | Curtis Creek Bridge Rehabilitation CMAR | Donald Marinelli, P.E., Hardesty & Hanover | |
| IBC 19-28 | NEXT beam bridges for 100 plus year service life | Jianwei Huang Ph.D., P.E., Southern Illinois University Edwardsville | |
| IBC 19-27 | Not Published | Contractor Manager/General Contractor (CMGC) Delivery of a Tied Steel Arch Bridge Re-Decking | Jonathan Eberle, P.E., AECOM |
| IBC 19-26 | Measurement and Use of Pile Set-Up in Design and Construction of the I-480 Valley View Bridge | Randy Thomas, Jacobs | |
| IBC 19-25 | Effects of Stiffness, Creep, and Shrinkage on RC Arch Bridges | Leon Lung-Yang Lai, Ph.D., P.E., S.E., Specialty Engineering, Inc. | |
| IBC 19-24 | NJDOT Sign Structure LRFD Design Standard Upgrades | George Zimmer, WSP | |
| IBC 19-23 | Steel Bridge Member Resistance – AASHTO Compared to Other International Codes | Terry Cakebread, BSc, Ceng., MICE, LUSAS | |
| IBC 19-22 | Centennial Bridge - A New Connection to the Historic Cabrillo Bridge in Balboa Park | Anthony Sanchez, Ph.D., P.E., Systra - International Bridge Technologies | |
| IBC 19-21 | Not Published | Evaluation of Fabrication Effects for a Lift Bridge Steel Orthotropic Deck | Sougata Roy, Ph.D., Rutgers, The State University of New Jersey |
| IBC 19-20 | Iowa City Gateway: Park Road Bridge | Natalie McCombs, P.E., S.E., HNTB | |
| IBC 19-19 | Carbon FRP Jackets for Seismic Strengthening of Bridge Piers - A Case Study | Gregg Blaszak, Milliken Infrastructure Solutions, LLC | |
| IBC 19-18 | Flexura Strengthening of Heavily Corroded Steel Members Using CFRP | Samuel Sherry, Virginia Tech | |
| IBC 19-17 | Emergency Bridge Repairs During the Winter, Chisago County Rd 10 Over 1-35 | Mark Pribula, P.E., Minnesota DOT | |
| IBC 19-16 | Application of ABC Techniques in the Travis Spur Rail Bridge Replacement in Staten Island, New York | Jing Kang, P.E., SJH Engineering, P.C. | |
| IBC 19-15 | Collaboration & Innovation in Emergency Response | Kyle Smith, P.E., S.E., Greenman-Pedersen, Inc. | |
| IBC 19-14 | More Than A Bridge - Rehabilitating Arlington Memorial Bridge: Our Capital's Ceremonial Entrance | Shane Beabes, P.E., AECOM | |
| IBC 19-13 | South Tenth Street Bridge Rehabilitation | Stan Nalitz, P.E., AECOM | |
| IBC 19-12 | Designing Out Risk: The North Hero-Grand Isle Bridge Replacement Project | Michael Mozer, P.E., HDR | |
| IBC 19-11 | Design and Construction of Post-Tensioned Straddle Bents for US 301 over SR 1, New Castle County, Delaware | Loai El-Gazairly, Ph.D., P.E., Whitman, Requardt & Associates , LLP | |
| IBC 19-10 | A New Perspective of Accelerated Bridge Construction | Joan Zhong-Brisbois, Ph.D., P.E., | |
| IBC 19-09 | Field Evaluation of a Shallow Press Brake Formed Tub Girder with a Steel Sandwich Plate Deck | Karl Barth, Ph.D., West Virginia University | |
| IBC 19-08 | ABC Replacement of Commonwealth Avenue Bridge in Boston, MA | Justin Ponting, Walsh Construction Company | |
| IBC 19-07 | Innovative ABC Replacement of a Freight Railroad Bridge in Fort Worth, Texas | Doug VanSlambrook, The Walsh Group | |
| IBC 19-06 | ABC in Florida - A Practical Look Into Past, Present, and Future FDOT Projects Utilizing ABC Techniques | Matthew Kosar, Florida DOT | |
| IBC 19-05 | Non-Destructive Testing on High Load Multirotational Bearings | Ronald Watson, R.J. Watson, Inc. | |
| IBC 19-04 | Case Studies of Bridge Failure due to Scour and Prevention of Future Failures | Roger Simpson, Ph.D., AUR, Inc. | |
| IBC 19-02 | Incremental Launching Method for Cayirköy Bridges | Francois Pissot, Freyssinet | |
| IBC 19-01 | Automated Reinforcement of Bridges Under a BIM Perspective | Alexander Mabrich, P.E., MSc, MBA, Bentley Systems |