
IBC 24-16
$25.00
IBC 24-16: Construction engineering of the US 181 Harbor Bridge Replacement main spans
Quentin Marzari, P.E., S.E., Arup, San Francisco, CA ; Jonathan Aylwin, Arup, Corpus Christi, TX; Manuel Contreras Pietri, CFC USA, Miami Beach, FL; Javier Campos, Arup, Los Angeles, CA; Luke Tarasuik, Arup, New York, NY
