IBC 20-45

$25.00

IBC 20-45: Construction of the Gilman Arch Bridge at UC San Diego
Anthony Sanchez, P.E., Sytra IBT, San Diego, CA; Adrian Cortez, P.E., Caltrans, San Diego, CA