IBC 21-23
$25.00
IBC 21-23: Replacement of the BNSF Truss 66.4 ā A Multi-Level Approach to Accelerated Bridge Construction – Fabrication to Roll-
On to Float-In
Joe Knapp, Genesis Structures, Kansas City, MO; Kyle Izatt, Advanced American Construction, Portland, OR; Alan Bloomquist, BNSF Railway, Kansas City, KS