IBC 23-53
$25.00
IBC 23-53: SR 0095 over Tacony and Bridge Street: Curved Girder viaduct with Integral Post-tensioned Concrete Cross-Girder
Tyler Kerstetter, CDM Smith, Harrisburg, PA; Hassan Alqennah, P.E., CDM Smith, Pittsburgh, PA; Avi Hawver, P.E., and Robin Dominick, P.E., PMP, CDM Smith, Philadelphia, PA