2018: Industrial: Tenaska Westmoreland Generating Station
2017 Transportation: Beechwood Boulevard (Greenfield) Bridge Replacement
Owner: City of Pittsburgh
Designer: HDR
Constructor: Mosites Construction
2017 Commercial: Union Trust Building
Owner: The Davis Companies
Architect: Perfido Weiskopf Wagstaff + Goettel (PWWG)
MEP Engineer: CJL Engineering
Structural Engineer: Atlantic Engineering Services
Construction Manager: Mascaro Construction
2017 Industrial/Energy: Shell Early Works Project
Owner: Shell Corporation
Owner’s Rep: Jacobs Engineering
General Contractors: Trumbull/Mascaro
2017 Sustainability: Frick Environmental Center
Owner: Pittsburgh Parks Conservancy
General Contractor: PJ Dick
Architect: Bohlin Cywinski Jackson
Others: H.F. Lenz Company, LaQuatra Bonci Associates, Barber & Hoffman, Nitsch Engineering, Atelier Ten, Ram-Tech Engineers (this includes design and engineering consultants.)
2017 Innovative: PennDOT’s Innovative Public-Private Partnership CNG Transit Fueling (P3) Program
Owner: PennDOT
Contractor: Trillium CNG
Designer: Larson Design Group
2016 Commercial: UPMC Lemieux Sports Complex
Owner: UPMC Corporate Construction and Real Estate
Architect: BBH Design
Engineer: CJL Engineering
General Contractor: P.J. Dick
2016 Industrial: Center Township Potable Water Source of Supply, Transmission and Interim Water Treatment Facility
Owner: Center Township Water Authority
Engineer: Lennon Smith Souleret Engineering, Inc.
Prime Contractors: Guy’s Mechanical Systems, Inc. and Trumbull Corporation
2016 Innovative Construction Methods: Milton-Madison Bridge Project
Owner: Indiana Department of Transportation
Prime Consultant: Michael Baker International
2016 Sustainable: Lower Hill Infrastructure
Owner: Sports & Exhibition Authority of Pittsburgh
Prime Consultant: Michael Baker International
2016 Transportation: Hulton Bridge
Owner: PennDOT District 11-0
Prime Contractor: Brayman Construction
Prime Design Consultant: Gannett Fleming, Inc.
2015 Transportation: East Liberty Transit Center
Owner: Eastside Limited Partnership III, and the Urban Redevelopment Authority
Construction Manager: Michael Baker International
Engineer: CDM Smith
2015 Advanced Technology: Christchurch Sample Testing and Analysis
Owner’s Representative: Robertson & Company for the City of Christchurch
Engineer: RIZZO Associates
2015 Sustainability: Edgewater at Oakmont
Owner: Edgewater Properties, LP and Kacin Companies, Inc.
General Contractor: Kacin Companies, Inc.
Engineering and Environmental Consultants: KU Resources, Inc.
2015 Commercial: Industrial Scientific Corporate Headquarters
Owner: Industrial Scientific Corporation
General Contractor: Mascaro Construction, LP
Engineer: IDC Architects, a CH2M Company
2014 Transportation: Route 28 East Ohio Street Improvements
Owner: Pennsylvania Department of Transportation
2014 Commercial: Allegheny Health Network Health & Wellness Pavilion
Owner: Allegheny Health Network
2014 Sustainability: Energy Innovation Center (EIC)
Owner: Pittsburgh Gateways Corporation
2014 Industrial: Newtown Creek Wastewater Treatment Plant
Owner: New York City Department of Environmental Protection
2014 Rehabilitation: Squirrel Hill Tunnel Rehabilitation
Owner: Pennsylvania Department of Transportation
2014 Higher Education: SUNY Polytechnic Institute
Owner: College of Nanoscale Science and Engineering
2013 Transportation: Meadow Lands Interchange Project
Owner: Pennsylvania Department of Transportation
2013 Commercial: J&L Tunnel Modification Project
Owner: CSX Transportaton, Inc.
2013 Sustainable: The Phipps Conservatory and Botanical Gardens
Principal Architect: The Design Alliance Architects
2013 Industrial: U.S. Steel “C” Coke Oven Battery
Owner: United States Steel Corporation
2012 Commercial: UPMC East Hospital
Owner: UPMC
2012 Remediation: BNY Mellon Center Exterior Remediation
Owner: BNY Mellon Bank
2012 Industrial: Houston Natural Gas Processing Plant
Owner: MarkWest Liberty Midstream & Resources, LLC
2012 Transportation: North Shore Connection
Owner: Port Authority of Allegheny County
2011 Sustainable: Zero Liquid Discharge for FGD Wastewater
Owner: ENEL
2011 Commercial: David Lawrence Convention Center Riverfront Plaza
Owner: Pittsburgh Sports & Exhibition Authority
2011 Industrial: Whitely Substation Withstands Mine Subsidence
Owner: West Penn Power/First Energy
2011 Transportation: PA Turnpike Reconstruction from Irwin to New Stanton
Owner: PA Turnpike Commission
2010 Commercial: 3 PNC Plaza
Presented to: Astorino / PJ Dick
2010 Transportation: SR 19, Section A-27, West End Improvement Project
Presented to: Michael Baker, Jr., Inc. & PennDOT District 11-0
2010 Civil: Taum Sauk Upper Reservoir Dam Restoration Project
Presented to: Paul C. Rizzo Associates, Inc. and AmerenUE
2009 Children’s Hospital – Owner: UPMC; Architect/Engineer: Astorino and the Parkway Missing Ramps Owner: PennDOT; Engineering Consultant: Michael Baker Corporation; Contractor: Balfour Beatty
2008 I-35W Bridge Replacement Minneapolis, MN – Owner: Minnesota Department of Transportation; Designer: FIGG Bridge Engineers; Contractor: Flatiron-Manson, JV
2007 Transportation Category: Pyandzh River Bridge Project – Governmental Construction Authority: USACE – Afghanistan Engineer District & TransAtlantic Programs Center; Engineering & Design, On-Site Consulting Agent for USACE: Michael Baker Jr., Inc.
2007 Industrial Category: “C” Blast Furnace Rebuilding Project – Owner: SeverStal North America; Primary Design Professional: ATSI, Inc.; Construction Manager: Graycor; Other Project Team Members: Paul Wurth, Inc., ATAC Engineering, Inc., Hatch, Amerex, Quattro Associates, Inc., Siemens VAI, The Thomas Group, Total Equipment Company, Woodings Industrial Corporation, SNC-Lavalin America, Inc.
2007 Commercial Category: Phipps Conservatory Expansion Project – Owner: Phipps Conservatory; Construction Manager: Turner Construction Co.; Project Architect: IKM
2006 Commercial Category: BioMedical Science Tower 3 (BST3)
Owner: University of Pittsburgh
2005 Industrial Category: AP1000 Nuclear Reactor
Owner: Westinghouse Electric Company
2005 Transportation Category: Erie Bayfront Connector Highway
Owner: Pennsylvania Department of Transportation
Engineer: GAI Consultants
2004 Public Works Category: Hurricane Ivan Flood Emergency
Road Repair Projects
Owners: Pennsylvania DOT Engineering District 11-0
Allegheny County Department of Public Works
Construction Manager: Michael Baker Corporation
2004 Transportation Category: Stage II Light Rail Transit System Project
Owner: Port Authority of Allegheny County
Engineer/Designers: URS Corporation, CDM, Parsons Corporation
Construction Managers: Gannett-Fleming, Inc., DMJM+Harris, Inc.
2004 Industrial Category: Wheeling-Pittsburgh Steel Corporation Electric Arc Furnace
Owner: Wheeling-Pittsburgh Steel Corporation
Engineer: R.T. Patterson Company, Inc.
Construction Manager: Continental Design & Management
2004 Commercial Category: UPMC Sports Performance Complex
Owner: UPMC
Architect/Engineer: Astorino
Construction Manager: Mascaro Construction Company, L.P.
2003 Commercial Project: David L. Lawrence Convention Center
Owner: Sports & Exhibition Authority of Pittsburgh and Allegheny County
Architect: Rafael Vinoly Architects, PC
Construction Managers: Joint Venture of Turner Construction, P.J. Dick and ATS-CHESTER Engineers, Inc.
2003 Transportation Project: Fort Pitt Bridge and Tunnel Rehabilitation
Owner: Pennsylvania Department of Transportation
Lead Engineer: HDR Engineering, Inc.
Contractor: Trumbull Corporation
2003 Heavy Construction Project: Saluda Dam Remediation
Owner: South Carolina Electric & Gas Company
Engineer: Paul C. Rizzo Associates
Contractor: Barnard Construction Company
2002 Environmental Reclamation Project: Summerset at Frick Park Project
Public/Private Developer: Urban Redevelopment Authority of Pittsburgh
Private Developer: Summerset Land Development Associates
Design Professional: GAI Consultants, Inc.
2002 Transportation Project: I-70 to PA 51 Project as part of the Mon Fayette Expressway
Owner: PA Turnpike Commission
Design Manager: Michael Baker Jr Inc.
Construction Manager: Trumbull Corporation
2002 Heavy Construction Project: Braddock Dam
Owner: US Army Corps of Engineers
General Contractor: JA Jones/Traylor Bros.
2001 Transportation Project: West Busway
Port Authority of Allegheny County
Michael Baker Jr., Inc.
Dick Corporation
2001 Commercial Project: PNC Park
Sports & Exhibition Authority of Pittsburgh & Allegheny County
Pittsburgh Pirates
HOK Sport
L.D. Astorino Companies
Barton Malow/Dick Corporation
2000 Commercial Project: PNC Firstside Center
PNC Financial Services Group
LDA – L.D. Astorino Companies
1999 Industrial Project: Rio Dam Project
Southern Energy of New York
Paul C. Rizzo Associates
1999 Commercial Project: St. Francis Hospital
LDA – L.D. Astorino Companies
1998 Commercial Project: American Video Glass Co.
R.T. Patterson Company, Inc.
P.J. Dick Incorporated
1998 Industrial Project: Lake Erie Steel Company
Kvaerner Constructors, Ltd.
Kvaerner Engineering & Construction
Kvaerner Songer, Inc.