IBC 2020 PDH Request Form Use this form to request your pdh credits.Ā Certificate will be emailed once form is validated. Note: PDH credits are only available for the LIVE presentations and not for viewing the On-Demand presentations. Name First Last CompanyPhone (xxx-xxx-xxxx)Email* Certificates will be sent to this email addressNY State Will be used for New York State Continuing Ed Requirements Florida State Will be used for Florida State Continuing Ed Requirements Florida License # Please check the events that you attended at the 2020 IBC. Additional comments can be entered below. Monday, October 19, 2020 Workshop: Bridge Preservation: An Integral Element in the Transportation Asset Management Plan Workshop: Strut and Tie modeling Proprietary: Substructure Rehabilitation using Galvanic Encasement of the Frederick G Gardiner Expressway Proprietary: Landslide Mitigation for Bridge Piers on Unstable Slope with Rows of Pressed-in Pipe Piles Proprietary: Weekend Deck Replacements of Four Interstate Bridges Utilizing a Simple Precast Deck System Proprietary: Monitoring of First Circular (reusable) Bridge Workshop: Domestic Scan 19-01 āLeading Practices for Detailing Bridge Ends and Approach Pavements To Limit Distress and Deteriorationā Keynote Session Construction SS: PennDOTās First SPMT Bridge Move: Shaler Street Bridge ā Owner, Designer & Contractor Perspective Construction SS: Auger Cast Pile on Miami, Florida 395 Design Build Project Construction SS: FIU Pedestrian Bridge Collapse Construction SS: Vermont Bascule Bridge Project Drones SS: Asset Management through Combined UAS and Rope Access Drones SS: A New View for Bridge Inspectors - Part 2 Drones SS: Enhancing Bridge Inspections with Drones Drones SS: PennDOT UAS Implementation Bridge Asset Management SS: Bridging Kentucky: Innovative Screening Process using Data Analytics and Life-Cycle Cost Analysis to Evaluate and Deliver 1,000 Bridge Restoration Program Bridge Asset Management SS: Bridge Health Index and Asset Management of Bridge Inventories Bridge Asset Management SS: BridgeCare, PennDOTās Open Source Bridge Asset Management System Tuesday, October 20, 2020 Workshop: Fast-Track Long Span Bridges with The Right Waterproofing Workshop: Maryland's Chesapeake Bay Bridge Program Management Design, Part 1: FHWA Bridge Welding Reference Manual Design, Part 1: The 2.4-Mile Long Rodanthe Bridge in North Carolina Design, Part 1: A Spliced Girder Bridge for the Wilmington Waterfront Design, Part 1: Low-Frequency Sinusoidal Web Girders Using Conventional Fabrication Techniques Design, Part 1: Emergency Response and Repair of State Route 6 Bridge over French Creek following Over-Height Vehicle Strike Design, Part 1: Rehabilitation and Widening of the Historic I-78 Mainline Spandrel Arch Bridge ABC, Part 1: EB Wilson Boulevard Bridge over Route 50: ABC Weekend Superstructure Replacement ABC, Part 1: Wellsburg Bridge - Construction Methods and Float In ABC, Part 1: Replacement of the Shaler Street Bridge using Self-Propelled Modular Transporters ABC, Part 1: Long-Lasting Project History Spurs Rapid Replacement of US Route 1 Over I-95 in Stamford, Connecticut Workshop: Load Rating and Posting: how we get here and new challenges Featured Agency: I-74 Corridor Reconstruction: A State-of-the-Art Design Featured Agency: I-74 over Mississippi River: Design and Construction of the Arch Superstructures Featured Agency: More Than ABC: Expedited Bridge Design and Construction through Planning and Collaboration Featured Agency: I-80/380 BIM PILOT PROJECT Featured Agency: Use of UHPC as a Deck Overlay for improving Performance of Bridges Featured Agency: Preservation and Maintenance Techniques for New and Late-Life Bridge Decks Construction, Part 1: Design and Erection of Structural Steel for the I-480 Valley View Bridge Construction, Part 1: Temporary Jacking Frame and Hanger for Delaware Memorial Bridges Construction, Part 1: The New Champ Clark Bridge: Using Design-Build to Span the Mississippi River Construction, Part 1: Construction of the Gilman Arch Bridge at UC San Diego Moveable Bridges: Metro North Movable Bridge Inspections and Evaluations Moveable Bridges: Rt 7 Wittpenn Bridge over the Hackesack Design and Construction Moveable Bridges: Retrofit of a Rolling Leaf Bascule Bridge Moveable Bridges: From Quincy to Haiti, Salvaging a Bridge for Charity over the Riviere Cochon Gras Moveable Bridges: Design Challenges of a Unique Conventional Highway Bridge that Swings Workshop: FIU Pedestrian Bridge Collapse - Testing of Full-Size Replicas of Failed Connection Wednesday, October 21, 2020 Workshop: Bridge Preservation and Repair using Ultra-High Performance Concrete (UHPC) ABC, Part 2: Temporary Bridge Slide Accelerates Interstate Construction in Minnesota ABC, Part 2: Using ABC to Widen Americaās Longest Bridge ā Whatās Old is New ABC, Part 2: Using ABC Techniques Under Phased Construction ABC, Part 2: Emergency Response to Route NJ 139WB Fire Cable Stayed (Design & Construction): Design of the Gordie Howe Bridge Cable Stayed (Design & Construction): Construction of the Tawatina LRT Bridge Workshop: Exploiting Redundancy of Steel Bridges with the New AASHTO Guide Specifications Workshop: 3D Digital Delivery for Bridge Projects : From Plans to Planless Submittals Rehabilitation, Part 1: Development of the Rehabilitation Program for the Historic 3rd Avenue Bridge ā A CM/CG Approach Rehabilitation, Part 1: Use of Carbon Fiber Composite Wrap and External Post-tensioning to Strengthen Prestressed Concrete I- beams in the Hampton Roads Bridge Tunnel Approach Spans Rehabilitation, Part 1: The Rehabilitation of the Historic Penn Street Bridge Rehabilitation, Part 1: Dehumidifying and Preserving the Main Cables of the Historic Anthony Wayne Bridge Rehabilitation, Part 1: Investing in Safety ā Designing for AASHTO Guide Specifications for Vessel Collision of Highway Bridges with Sustainable Materials Rehabilitation, Part 1: Upgrading a Tunnel for the 21st Century Construction, Part 2: High Load Jacking Frames for Pin and Hanger Replacement at the Robert Moses Causeway Construction, Part 2: Stites Tunnel: Replacing the Bridge Inside a Tunnel Construction, Part 2: Rapid Construction of a Precast Segmental Bridge Using the Span-by-span Method Construction, Part 2: US 54 Canadian River Cast-in-Place Segmental Bridge Thursday, October 22, 2020 Workshop: What's New in Steel Bridge Design Design, Part 2: Press Brake Formed Tub Girders Prove Successful in Project with Challenging Site Constraints Design, Part 2: Design and Construction of the SR 22 Bridge Replacements Design, Part 2: Innovative Design Techniques and Materials Benefit the New High Rise Bridge over Southern Branch of the Elizabeth River Design, Part 2: Development of Design Charts for Transverse Vertical Shear in Shear-Connected Precast Concrete Box Beam Bridges Subjected to AASHTO Truck Loading Design, Part 2: A Simplified Calculation Method of Flexural Strength Calculation for CFST Composite Truss Bridge Pedestrian: Walk Through the Eye of a Needle Pedestrian: Atwater Village Cable Stayed Equestrian Bridge Pedestrian: New Pedestrian Cable-Stayed Bridge at University of Memphis Pedestrian: Two Girder System Redundancy Design Glen Road Pedestrian Bridge Pedestrian: Mon Wharf Switchback Pedestrian Bridge Pedestrian: A Gathering Place for Tulsa - Taking The Midland Valley Trail Across Riverside Drive Workshop: BIM for Bridges and Structures: Changing the State of National Practice Railroad: Float-Out and Float-In of BNSF Wind River Truss Railroad: Accelerated Replacement of the CSX Bayou Sara Swing Span Bridge Railroad: Rail-Structure Interaction and Track Serviceability Analysis of High Speed Rail Bridges Railroad: Two Become One: Advanced Analysis and Design for Adjacent Precast Tub Girders for High Speed Rail Rehabilitation, Part 2: Diagnosis and Repair of Deficiencies in Ohio Post-Tensioned Bridges Rehabilitation, Part 2: In-depth Inspection, Refined Analysis and Retrofit of Two Skewed Steel Bridges with Distortion-Induced Fatigue Cracking Rehabilitation, Part 2: Deck Slab Closure Effects on Bridge Behavior: James River Bridge Case Rehabilitation, Part 2: Structural Testing and Monitoring of the I-15 Virgin River Bridges Rehabilitation, Part 2: Steel Truss Gusset Load Rating Rehabilitation, Part 2: Adding a Lane to the Historic Pulaski Skyway - Design and Construction of Large Floorbeam Cantilevers Workshop: Get Your A-GaME On! - Enhanced Geotechnical Site Characterization for Foundation Design and Constructability Workshop: Long-term Bridge Performance Research through Accelerated Structural Testing Friday, October 23, 2020 Workshop: Bridge Protective Coatings Foundation: Route 29/195 EB Ramp to Route 295 SB Emergency Repair Foundation: Execution of a Large-Scale Design-Phase Pile Test Program for the I-480 Valley View Bridge Foundation: Directionality of Soil Resistance for Design-Oriented Lateral Load Analysis of Bridge Piers Foundation: Electrochemical Chloride Extraction for Substructure Preservation - Milltown Road over US-1 Foundation: Underwater Rehabilitation of the SR 141 (Newport Viaduct) Piers 2 and 3 Foundations Additional CommentsCertification* I confirm that I have attended the above checked sessions and would like them to be applied towards Professional Development Hours (PDH) credit issued through the Engineersā Society of Western Pennsylvania for my attendance at the 37th International Bridge Conference. Δ